Laserfiche WebLink
X i M c I A IN <br />CoxjMcLain Environmental Consulting will perform a peer review and quality control check of the Public <br />Review Draft EA prior to distribution to CoSM and HUD. <br />Subtask 3.9 Agency Scoping Support <br />Based on conversations with HUD personnel, a formal agency scoping meeting is not needed nor is a <br />Federal Register Notice ofIntent for the EAdocument otthis time. However, public agency scoping letters <br />will behandled byCox|PNoLoinEnvironmental Consulting. Text and/or mapping that iogenerated for EA <br />document will bnused kosupport the public agency scoping process. |tisanticipated that public scoping <br />letters will be sent to the following agencies: U.S. Army Corps of Engineers, U.S. Environmental Protection <br />Agency, U.S. Fish and Wildlife Service, Federal Emergency Management Agency, Texas Commission on <br />Environmental Quality, Texas Parks and Wildlife Department, and Texas Historical Commission. <br />w Conference call withCn3M and HUD personnel to discuss content and key issues ofthe <br />Preliminary Draft EA. <br />Deliverables <br />° One (1) Socioeconomic reportlmemorandum. <br />w One (1) <br />* One (1) Cultural Resources (archaeological surveylhistoric property) reportlmemorandum. <br />City of San MarcoslHUD Responsibilities <br />° One set of comments unthe Preliminary Draft EA. <br />* Share Public Review Draft EA comments. <br />Task 4 — Final EA and FNSI <br />4.1 Pndiminam'Final HUD Environmental Assessment and TVVDBEnvironmental Review <br />Upon receipt ofall Public Review Draft EAcomments from CoGMand HUD, one (1)comment/response <br />matrix will be developed to ensure all issues are addressed in the Preliminary Final EA. Coxj&4cLan <br />Environmental Consulting may request o conference call to d|aouoo specific comments orinconsistencies <br />that need to be rectified in the Preliminary Final EA. It is assumed that up in two (2) CoxjMuLa/n <br />Environmental Consulting staff will attend the conference noU. If a conference ueU is not needed. <br />Oon|McLain Environmental Consulting will address the Public Review Draft EAcomments and provide <br />Preliminary Final EAfor CoSW1 and HUD review hn ensure the requested changes are completed to their <br />satisfaction. One set ofnon'contrmd|otory comments on the Preliminary Final EA is expected from Co8K4 <br />and HUD. Cox|K4oLa|n Environmental Consulting will provide CoSW4 and HUD with one (1) <br />comment/response matrix for the insertion ofcomments. <br />CoxjMcLain Environmental Consulting will perform a peer review and quality control check of the <br />Preliminary Final EA prior to distribution to CoSM and HUD <br />. <br />4.3 Final HUD Environmental Assessment and TWDB Environmental Review <br />Following CoGM and HUD review of the Preliminary Final EA, the document will be turned into the Final <br />EA for public and agency distribution. By this point, only minor adib/ha| changes are expected. If <br />substantive changes are required, a scope of work modification will be requested. <br />