Laserfiche WebLink
Systemwide Land Use Assumptions for the Implementation of Impact Fees <br /> Total Build Out Population Projections <br /> The total developed land within the Water Service Area is 24,172 acres which is approximately 39% built out. <br /> The total developed land within the Wastewater Service Area is 26,989 acres which is approximately 24% built <br /> out. <br /> The following table documents the population projections for 100%build out. <br /> Table:Total Build Out Population Projections <br /> Water&Wastewater Service Area <br /> Water Service Area Wastewater Service Area <br /> 2017 Population Estimate* 67,468 75,330 <br /> Percent Developed 38.8% 24.0% <br /> Population at 100% Developed 173,885 313,875 <br /> (Total Build Out) <br /> *Source:City of San Marcos,January 1,2017 Population Estimate <br /> Methodology—Enter Estimated Population/Percent Developed <br /> Page 10 <br />