Laserfiche WebLink
reconnect charge, cost of repairs and replacement of equipment and <br /> estimated charges for any diverted services. <br /> (6) A meter test fee established by the city council must be paid when a <br /> customer requests a test of city metering equipment. The request <br /> must be in writing, and the current standards of the American <br /> National Standards Institute will apply to the test. If the test result is <br /> outside the standards, the meter test fee will be refunded, the city <br /> will pay all testing costs and the test results will be used to make an <br /> adjustment in the customer's account. The adjustment will be for a <br /> period of either the six months preceding the request or the period <br /> of time the account has been in the customer's name, whichever is <br /> shorter. <br /> (7) A customer requested outage fee established by the city council <br /> must be paid by a customer if they request that the city dispatches a <br /> crew to disconnect their electrical service a request for service or <br /> problem is on the customer's. <br /> (8) A repeat-line locate fee in the amount of the city's actual cost plus <br /> ten percent must be paid for second or subsequent water or <br /> wastewater electric utility line locates at the same service location <br /> within 90 days of a previous line locate. <br /> (9) A street banner installation/removal fee established by the city <br /> council may be charged for the installation and removal of street <br /> banners. <br /> (10) Effective on January 1, 2009, an electric transformer cost recovery <br /> fee shall be paid for new or upgraded residential, commercial, <br /> Marcos Electric Utility(SMEU)for each transformer.In the case of <br /> purchase price paid by SMEU for the new transformer and the value <br /> of the transformer being removed. The fee will be waived if a <br /> developer furnishes, at its own expense, transformers that meet <br /> transformer at the time of installation. Transformer sizing will be <br /> behalfThe City provides residential electric utility customers an <br />