My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2018-122/approving an Advance Funding Agreement with the State of Texas, acting through the Texas Department of Transportation (CSI No. 0914-33-077), for the Downtown Accessible Traffic Signal Pedestrian Improvement Project, with an estimated cost of
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2018
>
Res 2018-122/approving an Advance Funding Agreement with the State of Texas, acting through the Texas Department of Transportation (CSI No. 0914-33-077), for the Downtown Accessible Traffic Signal Pedestrian Improvement Project, with an estimated cost of
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 10:00:20 AM
Creation date
8/23/2018 10:21:24 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2018-122
Date
8/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TxDOT: Federal Highway Administration: <br /> CS.)# 0914-33-077 CFDA No. 20.205 <br /> District# 14-Austin CFDA Title Highway Planning and Construction <br /> Code Chart 64# 37950-City of San Marcos <br /> San Marcos—Downtown <br /> Project Name Accessible Pedestrian Traffic AFA Not Used For Research&Development <br /> Signal Improvements <br /> B. All contract letting and award procedures must be approved by State prior to letting <br /> and award of the construction contract, whether the construction contract is awarded <br /> by State or by Local Government. <br /> C. All contract change order review and approval procedures must be approved by State <br /> prior to start of construction. <br /> D. Upon completion of Project, the party constructing Project will issue and sign a <br /> "Notification of Completion" acknowledging Project's construction completion. <br /> E. For federally funded contracts, the parties to this Agreement will comply with federal <br /> construction requirements provided in 23 CFR Parts 633 and 635, and shall include the <br /> latest version of Form "FHWA-1273" in the contract bidding documents. If force <br /> account work will be performed, a finding of cost effectiveness shall be made in <br /> compliance with 23 CFR Subpart 635.B. <br /> F. Any field changes, supplemental agreements, or revisions to the design plans that may <br /> occur after the construction contract is awarded will be mutually agreed to by State and <br /> Local Government prior to authorizing the contractor to perform the work. Prior to <br /> completion of Project, the party responsible for construction will notify the other party to <br /> this Agreement of the anticipated completion date. All parties will be afforded the <br /> opportunity to assist in the final review of the construction services performed by the <br /> contractor. <br /> 12. Project Maintenance <br /> A. Upon completion of Project, Local Government will be responsible for maintaining the <br /> completed facility for public use. The property shall be maintained and operated for the <br /> purpose for which it was approved and funded for a period of time commensurate with <br /> the federal investment or State rules, whichever is greater. Should Local Government <br /> at any time after Project completion decide it can no longer maintain and operate <br /> Project for its intended purpose, Local Government shall consult with State and the <br /> FHWA as to the disposal or alternate uses, consistent with Project's original intent. <br /> State may require Local Government to return the federal funds in accordance with <br /> 2 CFR Part 200 federal recapture requirements. Should Local Government consider <br /> conveying the property, State and FHWA must be notified prior to the sale, transfer, or <br /> disposal of any property that received federal funds. Written concurrence of approval <br /> for the transaction, detailing any required recapture, must be obtained from FHWA <br /> prior to the transaction. Advance notice from Local Government of their intended action <br /> must be submitted to State for an FHWA review a minimum of 90 days prior to any <br /> action being taken by Local Government. Local Government shall be held responsible <br /> for reimbursement of all federal funds used or a portion of those funds based on a pro- <br /> rata amount, considering the original percentage of federal funds provided and the time <br /> elapsed from Project completion date. This same percentage of reimbursement also <br /> applies to any amount of profit that may be derived from the conveyance of the <br /> property, as applicable. <br /> B. Any manufacturer warranties extended to Local Government as a result of Project shall <br /> remain in the name of Local Government. State shall not be responsible for honoring <br /> any warranties under this Agreement. <br /> Page 8 of 18 <br /> AFA-AFA TASA LF Rev 03/16/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.