Laserfiche WebLink
ARTICLE IV <br />PERFORMANCE <br />A. The COSM/UNIVERSITY agree to devote their diligent and professional efforts and <br />abilities to implement Subtasks 3.1 and 3.3, and the Deliverables shown here, and for <br />which Program Funding has been approved in accordance with the WPP. <br />0 BMP Selection Methodology Report; including final BMP selection, and <br />calculation of pollution reduction estimates; <br />0 Timeline for BMP construction <br />0 Notification of Bid solicitations <br />0 Notification when subcontractors hired <br />0 BMP Design Reports <br />0 Quarterly BMP installation progress <br />0 BMP Post -Construction Reports <br />0 Documentation of completion of the Downtown BMP, including photo <br />documentation. <br />0 Descriptive signs designed, manufactured and photo documentation of signs <br />installed at each BMP site <br />B. It shall be the COSM/UNIVERSITY responsibility to ensure that each Subtask is completed <br />in accordance with the schedules, budgets, descriptions and specifications contained in <br />the approved WPP. <br />C. When implementing the Conservation Measures, the COSM will be responsible for its <br />contractors in all respects including their compliance with applicable laws and their safety, <br />including without limitation, all Occupational Safety and Health Administration <br />(OSHA) standards, requirements, and regulations. <br />D. The COSM warrants that it will implement the Subtasks described in the approved <br />WPP in a good and workmanlike manner, strictly in accordance with the standards of the <br />associated scopes of work and with the purpose and intent to achieve full compliance <br />with the requirements of the approved WPP. <br />ARTICLE V <br />INVOICING AND REIMBURSEMENTS <br />A. The COSM shall submit only a final invoice to UNIVERSITY upon completion of the WPP <br />Subtasks 3.1 and 3.3. The invoice packet shall contain, at a minimum: <br />Page 3 of 10 <br />