My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-063/Interlocal Agreement with Texas State University for Watershed Protection Plan funding; providing for the reimbursement by Texas State University to the City of San Marcos in the sum of $35,000 for the development of best management practice
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-063/Interlocal Agreement with Texas State University for Watershed Protection Plan funding; providing for the reimbursement by Texas State University to the City of San Marcos in the sum of $35,000 for the development of best management practice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 9:21:53 AM
Creation date
4/22/2019 10:56:05 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-63
Date
4/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARTICLE IV <br />PERFORMANCE <br />A. The COSM/UNIVERSITY agree to devote their diligent and professional efforts and <br />abilities to implement Subtasks 3.1 and 3.3, and the Deliverables shown here, and for <br />which Program Funding has been approved in accordance with the WPP. <br />0 BMP Selection Methodology Report; including final BMP selection, and <br />calculation of pollution reduction estimates; <br />0 Timeline for BMP construction <br />0 Notification of Bid solicitations <br />0 Notification when subcontractors hired <br />0 BMP Design Reports <br />0 Quarterly BMP installation progress <br />0 BMP Post -Construction Reports <br />0 Documentation of completion of the Downtown BMP, including photo <br />documentation. <br />0 Descriptive signs designed, manufactured and photo documentation of signs <br />installed at each BMP site <br />B. It shall be the COSM/UNIVERSITY responsibility to ensure that each Subtask is completed <br />in accordance with the schedules, budgets, descriptions and specifications contained in <br />the approved WPP. <br />C. When implementing the Conservation Measures, the COSM will be responsible for its <br />contractors in all respects including their compliance with applicable laws and their safety, <br />including without limitation, all Occupational Safety and Health Administration <br />(OSHA) standards, requirements, and regulations. <br />D. The COSM warrants that it will implement the Subtasks described in the approved <br />WPP in a good and workmanlike manner, strictly in accordance with the standards of the <br />associated scopes of work and with the purpose and intent to achieve full compliance <br />with the requirements of the approved WPP. <br />ARTICLE V <br />INVOICING AND REIMBURSEMENTS <br />A. The COSM shall submit only a final invoice to UNIVERSITY upon completion of the WPP <br />Subtasks 3.1 and 3.3. The invoice packet shall contain, at a minimum: <br />Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.