Laserfiche WebLink
DocuSign Envelope 1D: 1198537C-14E9-405C-AADl-89OlA5D5DO16 <br />ATTA H M E N T A <br />CITY OF SAN MAR OS <br />Line Drive Improvements and Highway 80/Davis Lane Wastewater Rehab <br />SCOPE OF SERVICES <br />15, Construction Project Schedule: LNV will develop a Construction Schedule for the <br />project consisting of design, bid and construction phases. The schedule will be <br />updated during design, <br />b, 60% Comment Response Letter. <br />c. 90% LNV will provide two (2) hard copies of 11" x 17" plan sets and one (1) pdf <br />electronic copy. The plan set will also contain the following: <br />1. Cover Sheet <br />2. General Notes <br />3. Project Layout Sheet: LNV will provide a layout of the project with plan sheet <br />references. <br />4, Overall Quantity Sheet: LNV will provide a quantity table that includes individual <br />sheet quantities and the overall project quantities. <br />5. Wastewater Line Plan and Profile Sheets: Estimated Number of Sheet — eighteen <br />(18). <br />6. Water Line Plan and Profile Sheets: Estimated Number of Sheets -- nine (9). <br />7. Sidewalk Plan Sheets: Estimated Number of Sheets — two (2). <br />8. Drainage Plan and Profile Sheets: Estimated Number of Sheets --- nine (9). <br />9. Utility Layout Sheets: Estimated Number of Sheets — eighteen (18). <br />10. Detail Sheets <br />11. Erosion Control Plan and Details <br />12. Traffic Control Standard Details <br />13. Engineer's OPCC. <br />14. Construction Project Schedule, LNV will develop a Construction Schedule for the <br />project consisting of design, bid and construction phases. The schedule will be <br />updated during design. <br />d. 90%Comment Response Letter. <br />e. 99%: LNV will provide two (2) hard copies of 11" x 17" plan sets and one (1) pdf <br />electronic copy. The plan set will also contain the following: <br />1. Cover Sheet <br />2. General Notes <br />0 <br />