My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-058/approving an Agreement with LNV, Inc. for the provision of Professional Engineering Services for the Linda Drive Improvements Project in the estimated amount of $875,688
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-058/approving an Agreement with LNV, Inc. for the provision of Professional Engineering Services for the Linda Drive Improvements Project in the estimated amount of $875,688
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2019 4:10:42 PM
Creation date
4/29/2019 10:07:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-58
Date
4/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: 11985370µ14E9-4950-AAD1-8991A5D5DOl6 <br />ATTACHMENT A <br />CITY OF SAN MARCOS <br />Linda Drive Improvements and Highway 80/Davis Lane Wastewater Rehab <br />SCOPE OF SERVICES <br />9. Deliverables.- <br />a. <br />eliverables: <br />a. Submittal Log: LNV will prepare a spreadsheet for identifying required submittals that the <br />Contractor must provide as well as tracking to -date submittals and RFI's provided by the <br />Contractor. <br />Phase E — Record Drawings <br />1. record Drawings: LNV will review the Contractor's redline as -built drawings and incorporate <br />deviations from the construction drawings as appropriate, record drawing information will be <br />based solely on the provided marked -up drawings and appropriate field documentation received <br />from the City, LNC! will also conduct a surface feature survey (inverts of manholes, valve <br />locations, etc,) of the improvements to help support the development of the as--builts LNV will <br />deliver three sets of 11 x 17 plan set for review. <br />2, Deliverables. After review, LNV will deliver one set of 2 x 34 and three 11 x 17 plan sets, one (1) <br />pdf electronic copy and one (1) CAD copy. <br />Supplemental Scope of Services <br />a, Boundary Survey: At the request of the City, LNC' will prepare legal description and exhibits <br />for up to 3 parcels determined by the City. <br />b. Environmental Assessment per HUD requirements if federal funds are applied to the project. <br />c. UPRR Permitting and Flagging Permit Fees, <br />Schedule <br />The following project milestones are estimated and may require modification pending preliminary <br />engineering results and construction timeframe constraints.- <br />30%/Preliminary <br />onstraints: <br />30%/Preliminary Engineer Report Submittal (11 o days) <br />60% Design Documents Submittal (80 days) <br />90% Design Documents Submittal (60 days) <br />99% Design Documents Submittal (45 days) <br />100% Design Documents Subrnitfal (30 days) <br />The estimated timeframes identified do not include time for City review of submittals. <br />City Responsibilities <br />1. The City will provide to LNV all data in the City's possession relating to LNV's services on the <br />Project. LNC! will reasonably rely upon the accuracy, timeliness, and completeness of the <br />information provided by the City. <br />2. The City will give prompt notice to LNV whenever the City observes or becomes aware of any <br />development: that affects the scope or timing of LNV's services. <br />3. The City will examine information submitted by LNV and render in writing or otherwise provide <br />comments and decisions in a timely manner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.