My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-090/approving and Interlocal Agreement with the Capital Area Metropolitan Planning Organization relating to a Platinum Planning Study to enhance Multimodal Transportation in the City of San Marcos and Capital Area
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-090/approving and Interlocal Agreement with the Capital Area Metropolitan Planning Organization relating to a Platinum Planning Study to enhance Multimodal Transportation in the City of San Marcos and Capital Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 12:54:01 PM
Creation date
5/31/2019 2:41:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-90
Date
5/21/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Area MPO and City of San Marcos Platinum Planning Study <br />Additionally, the consultant will perform an analysis to assist the City in determining the impacts <br />and a schedule of highway "turn back" of the following State highways: Loop 82, SH 80/East <br />Hopkins Street and SH 123. <br />Study Area (See below for the study area maps) <br />The focus of the San Marcos Platinum Planning Study is the Downtown/Midtown core and the <br />following corridors: Guadalupe Street (SH 123) between University Drive and FM -110, Hopkins <br />Street (SH 80) starting near the downtown square and ending near SH -21 east of the City, and a <br />north/south connector from SH -80 to IH -35 at Posey Road (potential extension of SH 21). As <br />stated previously, this study includes two areas of focus: <br />1. Corridors Plan Focus Areas — This study should consider an optimum integration of <br />transportation options for multimodal connectivity throughout the focus areas. <br />• Guadalupe Street (SH 123) —The section from University Drive on the west, to FM - <br />110 on the east. This corridor changes from a rural four lane bi-directional road <br />with one center turn lane to an urban arterial with 2-3 lanes of one-way travel <br />acting as a couplet with South LBJ Drive. The portion of the corridor in downtown <br />has sidewalks but they become irregular roughly a half mile east of IH -35 before <br />becoming non-existent as the corridor turns into a rural road. Land use along <br />Guadalupe Street includes mostly retail and commercial spaces (ranging from <br />urban to drive-thru suburban), fuel stations, and an overall auto -centric low- <br />density built form. <br />• Hopkins Street (SH 80) — The section starting near the downtown square and <br />ending near CR 1984 at the San Marcos Air, Rail, and Truck (SMART) Terminal east <br />of the City. This corridor changes from rural to urban with four lanes of bi- <br />directional travel with one center turn lane. The corridor includes discontinuous <br />sidewalks and a lack of streetscaping elements. Land use along Hopkins Street is <br />similar to that of Guadalupe Street's and includes mostly retail and commercial <br />spaces, fuel stations, City Government complex (Activity Center, Library and <br />Municipal offices) with an overall auto -centric low-density built form. <br />• North/South Connector (SH 21 extension) - This corridor does not yet exist but is <br />envisioned as an alternative relief route to IH -35. The corridor is defined as <br />running north/south roughly one mile east of IH -35 from SH -80 to the Comal <br />County Line. Most of the future right-of-way is in a rural context with portions <br />having suburban characteristics. <br />2. Centers Plan Focus Area - Development of a plan for a vibrant mixed-use center oriented <br />around the Downtown and Midtown neighborhoods. This includes development concepts <br />for dense mixed-use catalytic sites including the City Government complex, SH 21 <br />extension/SH 123/RR12 intersection, and the northwest corner of the IH 35/Hopkins St <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.