Laserfiche WebLink
. Airport <br />Project Name (11) Runway 13-31 Parallel Taxi <br />Project Description <br />Elimintate congestion, delays and safety concerns of back taxiing <br />Project Name (12) Runway 17 CAT I Approach <br />Project Description <br />GPS CAT I precision approach to allow larger aircraft and lower weather minimums <br />Project Name (13) Runway 17-35 Lengthening <br />Project Description <br />Lengthen to 7,000 from 5,200 <br />Project Name (14) Runway 17-35 Parallel Taxi <br />Project Description <br />Elimintate congestion, delays and safety concerns of back taxiing <br />Project Name (15) Taxiway "J" Resurface <br />Project Description <br />AIP Project- <br />Project Nam <br />Project Des <br />20,000 sf bu <br />service <br />e (16) Terminal Building <br />cription <br />ilding to support future commercial activity including scheduled air carrier <br />Project Cost: $ 3,450,000 <br />Project Cost: $ 2,300,000 <br />Project Cost: $ 2,875,000 <br />Project Cost: $ 3,450,000 <br />Project Cost: $ 1,500,000 <br />Project Cost: $ 4,657,500