My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2009-051
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2009
>
Ord 2009-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2009 10:55:06 AM
Creation date
9/10/2009 8:34:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Adopting
Number
2009-51
Date
9/1/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Drainage <br /> Project Name (1) Bishop and Prospect Drainage Project Cost: $ 276,000 <br /> Project Description <br /> Construct 750 If of pope and inlets to reduce flooding in 500 block of N. Bishop <br /> Project Name (2) Blanco Gardens Improvements Project Cost: $ 5,515,975 <br /> Project Description <br /> Install storm sewer on Sherbarb, Linda, Barbara, Clair, Mary, Bliss and Conway <br /> Project Name (3) Blanco River Channel & Over Project Cost: $ 400,000 <br /> Project Description <br /> Establish a periodic routine maintenance program to mow and remove debris along Blanco <br /> River <br /> Project Name (4) Castle Creek Drive Drainage Project Cost: $ 535,000 <br /> Project Description <br /> Reduce floodplain by replacing culverts under Castle Creek Dr <br /> Project Name (5) Comprehensive Plan Project Cost: $ 207,000 <br /> Project Description <br />• Enlarge study area to include new ETJ & SH130, changing growth patterns, land use assum ptions, growth projects and goals <br /> Project Name (6) Cottonwood Creek Det Study Project Cost: $ 250,000 <br /> Project Description <br /> Study feasibility of construction regional detention structure <br /> Project Name (7) Drainage Master Plan Update Project Cost: $ 672,782 <br /> Project Description <br /> 10 years old and due for revision, to include impact of FEMA elevations on storm sewer <br /> system. <br /> Project Name (8) Dunbar Improvements Project Cost: $ 3,700,884 <br /> Project Description <br /> Install storm sewer systems on San Antonio, Johnson and Mitchell and extension of Travis <br /> to MLK <br /> Project Name (9) East Guadalupe Imp Project Cost: $ 2,523,330 <br /> Project Description <br /> Install storm sewer systems on McGehee, LBJ and McKie <br /> Project Name (10) Hughson Heights Drainage Project Cost: $ 475,000 <br /> Project Description <br /> Routing storm flows to existing pond located on N. LBJ to reduce erosion & pollution in Sink <br /> Creek
The URL can be used to link to this page
Your browser does not support the video tag.