Laserfiche WebLink
Drainage <br />• <br />Project Name (11) Multi-Service Center <br />Project Description <br />Combined building to house W & WW, PW and electric to eliminate duplication and <br />facilitate coordination. <br />Project Name (12) NRCS Reservoir #5 Expansion <br />Project Description <br />Study feasibility of expanding regional detention structure on main stem of Purgatory Creek <br />Project Name (13) Parker Drive Drainage <br />Project Description <br />Construct ditch improvements to reduce flooding in 400 block of Parker <br />Project Name (14) Purgatory Creek Channel <br />Project Description <br />Imrpove channel to reduce overtopping of Hopkins Street in the 2-year storm event <br />Project Name (15) River Road Drainage <br />• Project Description <br />drainage improvements at River Road and the railroad underpass <br />Project Name (16) S Bishop Street Improvements <br />Project Description <br />Install storm sewer on S Bishop, Belvin and San Antonio with an outfall to Purgatory Creek <br />Project Name (17) Schulle Creek Culvert Imp <br />Project Description <br />Replace culverts to provide greater service and reduce overtopping. <br />Project Name (18) Sessom Creek Drainage Study <br />Project Description <br />Study feasibility of culvert improvements to protect vital infrastructure adjacent and within <br />university <br />Project Name (19) Stormwater Improvements <br />Project Description <br />System-wide improvements to address spot specific deficiencies and localized problems <br />• Project Name (20) Stream Gage Network <br />Project Description <br />Construct stream flow gauge at each NRCS reservoir to provide advanced flood warning <br />Project Cost: $ 1,150,000 <br />Project Cost: $ 250,000 <br />Project Cost: $ 165,000 <br />Project Cost: $ 400,000 <br />Project Cost: $ 1,088,567 <br />Project Cost: $ 1,670,030 <br />Project Cost: $ 50,000 <br />Project Cost: $ 250,000 <br />Project Cost: $ 1,530,000 <br />Project Cost: $ 750,000