My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2009-051
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2009
>
Ord 2009-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2009 10:55:06 AM
Creation date
9/10/2009 8:34:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Adopting
Number
2009-51
Date
9/1/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Electric <br />0 Project Name (10) Multi-Service Center Project Cost: $ 3,275,000 <br /> <br /> Project Description <br /> Combined building to house W & WW, PW and electric to eliminate duplication and <br /> facilitate coordination. <br /> Project Name (11) Mitchell Pole Change Out Project Cost: $ 74,750 <br /> Project Description <br /> Replace 40 y.o. line on Mitchell between Gravel and Belvin. <br /> Project Name (12) Poles Feeder SM-160 Feeder Project Cost: $ 387,500 <br /> Project Description <br /> Replace 35 y.o. line from Old Martindale to Hwy 123 <br /> Project Name (13) Ranch Road 12 Feeder RR-30 Upgrade Project Cost: $ 260,000 <br /> Project Description <br /> Addresses the reconductor of 4,100 feet of existing 336.4 thousand circluar mills to 795 <br /> thousand to serve the additional load development. <br />• Project Name (14) Rebuild Hillcrest-Ridgeway Project Cost: $ 431,250 <br /> Project Description <br /> Hillcrest is one of the oldest neighborhoods and has original lines requiring replacement <br /> Project Name (15) Rebuild SM 82 Dbl Circ Project Cost: $ 575,000 <br /> Project Description <br /> Replace 30 y.o. poles from San Marcos Substation to Loop 82 Substation <br /> Project Name (16) Reconductor 4/0 at Stone Campers Project Cost: $ 76,500 <br /> Project Description <br /> Reconductor in order to form a robust tieline with the future Cnayon substation feeder to be <br /> located west of 1-35. <br /> Project Name (17) Reconductor Castle Forest Fdr Project Cost: $ 97,750 <br /> Project Description <br /> Replace conductor with larger one to accommodate added load resulting from additional <br /> homes <br /> Project Name (18) Reconductor Fdr SM 180 Project Cost: $ 133,OOQ <br /> Project Description <br /> <br />• rehabilitation of SM feeder SM-180.
The URL can be used to link to this page
Your browser does not support the video tag.