My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2009-051
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2009
>
Ord 2009-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2009 10:55:06 AM
Creation date
9/10/2009 8:34:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Adopting
Number
2009-51
Date
9/1/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Electric <br />0 Project Name (19) Reconductor Post Road <br />Project Description <br />Reconstruction & reconductor of approx 3,700 feet due to the TxDot construction of an <br />overpass in the Post Raod area. <br />Project Name (20) Reconductor RR 12 Feeders <br />Project Description <br />Double feeder capacity from RR12 Substation to Craddock Avenue to service additional <br />load development <br />Project Name (21) Redwood Feeder Reconfiguration Projects <br />Project Description <br />The project addressed reconfiguration of the Redwood feeers to McCarty Lane Substation. <br />Project Name (22) Rep Bank 2 San Marcos Sub <br />Project Description <br />Power bank is at 90+% capacity and is near the end of its service life. Will increase from 20 <br />MW to 30 MW <br />Project Name (23) Replace Bank 1 SM Sub <br />• Project Description <br />Power bank is at 90+% capacity and is near the end of its service life. Will increase from 20 <br />MW to 30 MW <br />Project Name (24) Replace SCADA System <br />Project Description <br />Current system is out of date and run entirely on micro-processors, and requires <br />replacement for changing technology <br />Project Name (25) RTUs for Substation 7 <br />Project Description <br />for SCADA control and monitoring to prevent overloads and faults <br />Project Name (26) Street Light Replacement Program <br />Project Description <br />Annual project to address new street light installations. <br />Project Name (27) Substation 7 <br />Project Description <br />Project Cost: $ 132,180 <br />Project Cost: $ 755,000 <br />Project Cost: $ 139,500 <br />Project Cost: $ 1,535,250 <br />Project Cost: $ 1,535,250 <br />Project Cost: $ 200,000 <br />Project Cost: $ 20,000 <br />Project Cost: $ 1,088,000 <br />Project Cost: $ 500,000 <br />0 <br />I /1 <br />?_J
The URL can be used to link to this page
Your browser does not support the video tag.