My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2009-051
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2009
>
Ord 2009-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2009 10:55:06 AM
Creation date
9/10/2009 8:34:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Adopting
Number
2009-51
Date
9/1/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Safety <br />0 <br />Project Name (1) Academy at Holland Fire station Project Cost: $ 2,700,000 <br />Project Description <br />Fire Station constructed in 1954. This station needs to be replaced with a new station <br />capable of housing adequate personnel and fire apparatus. <br />Project Name (2) Aerial Apparatus Project Cost: $ 750,000 <br />Project Description <br />This project in contingent upon the opening of Fire Station #5. Want to purchase a 75' <br />aerial apparatus and required equipment. To meet Iso requirements and maintain our PPC <br />rating of 2 a aerial apparatus for every 2 firs stations is required. <br />Project Name (3) Airport Fire Station Project Cost: $ 4,500,000 <br />Project Description <br />Construct an additional station that will house conventional as well as aircraft rescut and fire <br />fighting to meet FAA regulations allowing airport growth <br />Project Name (4) Blanco Vista Fire Station Project Cost: $ 3,600,000 <br />Project Description <br />Construct an additional 7,500 s.f. station on city-owned property in Blanco Vista; funding for <br />design & construction. May include ambulance and police. <br />• <br />h Fi <br />St <br />ti <br />S 700 <br />000 <br />Project Cost: $ 3 <br />on <br />re <br />a <br />out <br />Project Name (5) Hwy 123 , <br />, <br />Project Description <br />Construct an additional 7,500 s.f. station near El Camino Real, to include design, land acquisition and construction <br />Project Name (6) Outlet Mall-HCC Fire Station Project Cost: $ 3,550,000 <br />Project Description <br />Construct an additional 7,500 s.f. station near the Outlet Mall, to include design, land <br />acquisition and construction <br />Project Name (7) Replace Aerial Sutphen Project Cost: $ 800,000 <br />Project Description <br />Replace the Sutphen 65' aerial apparatus with 75' model to maintain level 2 ISO. 65' will be <br />reassigned <br />Project Name (8) Replace Engine Broadway Sta Project Cost: $ 550,000 <br />Project Description <br />Replace with new engine equiped with air foam system and large diameter hose to match <br />the rest of the fleet. Current will become a reserve unit <br />Project Name (9) Replace Rescue Apparatus Project Cost: $ 400,000 <br />? • Project Description <br />Replace existing with a mini-pumper to make it more useful for its high call volume
The URL can be used to link to this page
Your browser does not support the video tag.