My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2009-051
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2009
>
Ord 2009-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2009 10:55:06 AM
Creation date
9/10/2009 8:34:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Adopting
Number
2009-51
Date
9/1/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Streets <br />0 <br /> Project Name (1) Loop 82 RR Overpass Post Realign Project Cost: $ 40,460,000 <br /> Project Description <br /> TxDOT project to construct railroad overpass on Loop 82/Aquarena Springs <br /> Project Name (2) Bike Ped Improvements Project Cost: $ 1,185,000 <br /> Project Description <br /> Bundle of multiple bike and pedestrian projects from Trans. Master Plan. Includes gap <br /> completion, signing and striping lanes and crossings, roadside trails, River Road/Riverside, <br /> Aquarena Springs, RR12 <br /> Project Name (3) Centerpoint Intersection Imp Project Cost: $ 335,225 <br /> Project Description <br /> Signal improvements, lighting and crosswalks at intersection with outlet entrances <br /> Project Name (4) Comprehensive Plan Project Cost: $ 207,000 <br /> Project Description <br /> Enlarge study area to include new ETJ & SH130, changing growth patterns, land use <br /> assumptions, growth projects and goals <br />• Project Name (5) Craddock Extension Project Cost: $ 2,438,000 <br /> Project Description <br /> Extend Craddock from Bishop to Wonder World extension <br /> Project Name (6) Donaldson Street Imp Project Cost: $ 243,800 <br /> Project Description <br /> Construct street using existing ROW providing connection between Guadalupe and LBJ, <br /> improving access to Transit Center <br /> Project Name (7) Downtown Sidewalks Project Cost: $ 2,806,000 <br /> Project Description <br /> Continue sidewalk renovation on LBJ from MLK to University with streetscape <br /> Project Name (8) Dunbar Street Recon Project Cost: $ 6,817,551 <br /> Project Description <br /> Reconstruct streets affected by water, wastewater & drainage improvements <br /> Project Name (9) FM 2439 Hunter Imp Project Cost: $ 6,400,000 <br /> Project Description <br /> Widen Hunter from Wonder World to Bishop <br /> Project Name (10) Heritage Neighborhood St. Reconstruction Project Cost: $ 7,100,000 <br /> Project Description <br /> Reconstruct streets affected by water, wastewater & drainage improvements
The URL can be used to link to this page
Your browser does not support the video tag.