Laserfiche WebLink
Wastewater <br />0 Project Name (1) Airport 8" Wastewater <br />Project Description <br />Construct line along SH21 from Bypass Creek Interceptor to new hangers identified in <br />Airport Master Plan <br />Project Name (2) Blanco Gardens <br />Project Description <br />Improvements to 41,700 If of existing deteriorating and undersized wastewater collection <br />system <br />Project Name (3) Bypass Crk WW <br />Project Description <br />Construct gravity ww main to allow flow to the Southeast Wastewater Treatment Plant. <br />Project Name (4) Cape Road Lift Station FM <br />Project Description <br />Contruct 4080 If of 18" force main from the Cape Road lift station to the SM River Lift <br />Station. <br />• Project Name (5) Comanche WW-Woods to Hutchison <br />Project Description <br />Reroute flows from TxSt down Comanche in a new line from Woods to south of Lindsey. <br />Project Name (6) Comprehensive Plan <br />Project Description <br />Enlarge study area to include new ETJ & SH130, changing growth patterns, land use <br />assumptions, growth projects and goals <br />Project Name (7) Cottonwood Crk WW S of CR 266 <br />Project Description <br />Construct line from CR266 to Southeast Wastewater Treatment Plant <br />Project Name (8) Cttnwd Crk WW SH 123 - CR 266 <br />Project Description <br />Construct line from Cottonwood Creek LS to CR266 <br />Project Name (9) Dunbar WW Improvements <br />Project Description <br />Replace deteriorated lines <br />Project Cost: $ 600,000 <br />Project Cost: $ 4,750,000 <br />Project Cost: $ 250,000 <br />Project Cost: $ 485,000 <br />Project Cost: $ 230,000 <br />Project Cost: $ 207,000 <br />Project Cost: $ 420,000 <br />Project Cost: $ 150,000 <br />Project Cost: $ 1,063,750 <br />f1 <br />u