My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2009-051
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2009
>
Ord 2009-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2009 10:55:06 AM
Creation date
9/10/2009 8:34:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Adopting
Number
2009-51
Date
9/1/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Wastewater <br /> Project Name (10) East Centerpoint WW Oversize Project Cost: $ 274,275 <br /> Project Description <br /> Participate in the oversize of ww extensions along Centerpoint Rd east of the Factory Shops <br /> to Old Bastrop Hwy. <br /> Project Name (11) Eastside Willow Creek Ph 3 Project Cost: $ 1,649,100 <br /> Project Description <br /> Line to connect existing line and Purgatory Creek Interceptor to the Eastside II Interceptor <br /> Project Name (12) Galisteo Ranch WW Oversize Project Cost: $ 609,500 <br /> Project Description <br /> Oversize lift station and force main associated with Galisteo Ranch development to provide <br /> service beyond the substation. <br /> Project Name (13) Main Improvements Project Cost: $ 2,438,000 <br /> Project Description <br /> Replace infrastructure throughout the City for sudden failures or in conjunction with other <br /> work <br /> Project Name (14) Main Lift Station Force Main Project Cost: $ 1,000,000 <br /> Project Description <br /> Construct additional force main from main LS to existing wastewater treatment plant <br /> Project Name (15) MLK CM Allen McGehee WW Project Cost: $ 1,230,000 <br /> Project Description <br /> Upsize lines to provide capacity to prevent spills during storm events <br /> Project Name (16) Old Bastrop WW Project Cost: $ 811,900 <br /> Project Description <br /> Construct line between Staples Road and the interceptor to the new Wastewater Treatment <br /> Plant <br /> Project Name (17) Posey Rd WW Project Cost: $ 761,875 <br /> Project Description <br /> Install gravity line between 135 and Old Bastrop Hwy. <br /> Project Name (18) Purgatory Creek WW Ph 1 Project Cost: $ 800,000 <br /> Project Description <br /> Install line from UPRR to intersection of Eastside II and Willow Creek sewers <br />fl <br />u
The URL can be used to link to this page
Your browser does not support the video tag.