Laserfiche WebLink
0 0 0 <br />Airport Summary <br />Project Category Prior Funding 2010 2011 2012 2013 2014 2015 2016 2017 2016 2019 <br /> <br />(1) Air Traffic Control Tower other $ 233,691 $ 330,000 <br />(2) Airport Lighting Upgrade other $ 1,150,000 <br />(3) Electric Vault Upgrade other $ 1,150,000 <br />(4) Fixed Base Operator Facility other $ 1,552,500 <br />(5) RAMP Grant Match other $ 50,000 <br />(6) North Side Development (NSD) Entry & Perimeter Road other $ 65,000 <br />(7) Northside Development (NSD) Apron Extension other $ 137,500 <br />(8) Perimeter Road other $ 1,552,500 <br />(9) Perimeter Security Fencing other $ 68,000 <br />10) Runway 13-31 Lengthening other $ 2,875,000 <br />11) Runway 13-31 Parallel Taxi other $ 3,450,000 <br />12) Runway 17 CAT 1 Approach other $ 2,300,000 <br />13) <br />14) <br />15) Runway 17-35 Lengthening other <br />Runway 17,35 Parallel Taxi other <br />Taxiway "J" Resurface other <br /> <br />$ 1,500,000 <br />f 3,450,000 $ 2,875,000 <br />16) Terminal Building Other <br />Total <br />$ 301,691 <br />3 50,000 $ 4,657,500 <br />$ 9,392,500 <br />$ 1,552,500 <br />$ 3,450,000 <br />$ 3,450,000 <br />$ 1,150,000 <br />f 2,875,000 <br />$ 2,300,000 <br />$ 2,875,000 <br />$ <br />llrainanP Summarv <br />Project Category Prior Funding 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 <br /> <br />(1) Bishop and Prospect Drainage Rev Bond. $ 276,1100 <br />(2) <br />(3) <br />(4) Blanco Gardens Improvements Cof o Bond. <br />Blanco River Channel d Over C or o Bond. <br />Castle Creek Drive Drainage C or o B.M. <br /> <br />$ 535,000 $ 639,975 $ 4,876,000 <br />$ 200,000 <br />$ 200,000 <br />(5) Comprehensive Plan Coro(Rev Sons. $ 103,500 $ 103,500 <br />(6) Cottonwood Creek Det Study C of0 Bonde $ 250,000 <br />(7) Drainage Master Plan Update C or of Rev Bo„ d.(other $ 212,000 S 460,782 <br />(8) Dunbar Improvements Coro Bond. $ 482,724 $ 3,218,160 <br />(9) East Guadalupe Imp C or o Bond. $ 329,130 $ 2,194,200 <br />10) Hughson Heights Drainage Cor 01 Rev Bond. 121,000 350,000 <br />(11) Multiservice Center Coro Bond. 1,150,000 <br />(12) NRCS Reseweir #5 Expansion Coro Bane. $ 250,000 <br />(13) Parker Drive Drainage Coro Bona. <br />(14) Purgatory Creek Channel Coto Bond. J $ 200,000 $ 200,000 <br />(15) River Road Drainage Coto BOnd. $ 1,088,567 <br />(16) 5 Bishop Street Improvements C of o Bond. 268,180 $ 1,401,850 <br />(17) Schulle Creek Culvert Imp Coro Bnds $ 50,000 <br />(18) <br />(19) <br />(20) <br />(21) Sessom Creek Drainage Study C of o Bond. <br />Stormwater Improvements Cor o(R.v Bond. <br />Stream Gage Network corn Bond. <br />Sunset Acres Improvements Cor o Bond. <br />172,500 <br />$ 172,500 <br />$ 172,500 <br />$ 172,500 <br />S 172,500 <br />$ 172,500 <br />$ 750,000 <br />$ 926,440 <br />$ 172,500 <br /> <br />$ 6,143,760 <br />$ 172,500 $ 250,000 <br />(22) Thorpe Lane Improvements C of of Rev Bond. $ 261,025 $ 792,350 <br />(23) Victory Gardens Improvements GO(Rev Bond. $ 3,890,860 $ 1,420,000 <br />(24) Wallace Addition Imp Cof o Sawa $ 1,261,665 <br />(25) Willow Springs Channel Coro Bond. S 200,000 S 200,000 <br />(26) Willow Springs Crk Detention Coro Bond. <br />Total <br />$ 51718,385 <br />$ 21733,030 <br />$ 3,165,145 <br />$ 4,875,267 <br />$ 1,273,257 <br />$ 5,531,224 <br />$ 5,570,600 <br />$ 6,316,260 <br />$ 772,500 $ 250,000 <br />$ 1,250,000 ( <br />$