Laserfiche WebLink
ATTACHMENT 1 <br />LCRA SCOPE OF SERVICES <br />San Marcos Electric Utility (SMEU) <br />Rattler Substation Addition — SMEU Low -Side <br />1. Safety: <br />LCRA places no business objective or priority above safety. <br />2. Project Background: <br />The Rattler Substation Addition project consists of building a new SMEU load -serving facility in <br />Hays County. <br />SMEU's scope consists of: <br />• The installation of an indoor, medium voltage distribution switchgear and feeders <br />• The installation of a control house and 12.5 kV distribution equipment <br />• Grading of the substation property <br />• The installation of one 138/12.5kV 30MVA powertransformer <br />• The installation of one 138 -kV Circuit Breaker <br />• The installation of security fencing <br />• The installation of duct banks leaving western edge of property to connect with existing <br />underground distribution infrastructure <br />• The installation of telecommunications forsecurity <br />• The Installation of telecommunications for relaying <br />• The installation of telecommunications power supplies <br />• Easements, permits, etc. for use of the adjacent detention pond. <br />3. LCRA Description of Services: <br />At SMEU's request, LCRA will engage and secure the services of an Engineering Consultant to <br />design SMEU's scope outlined in Section 2 of this document for the Rattler Substation Addition <br />project. LCRA will own and manage the contract with the Engineering Consultant. <br />LCRA will also provide review services of the following engineering deliverables associated with <br />SMUE's scope during the project design stage: <br />A. Electrical (10%) review of the following design submittals: <br />• Detailed Construction Document <br />• Initial one -line <br />• Ultimate one -line <br />