My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-161/approving an Engineering Services Contract with the Lower Colorado River Authority (LCRA) for provision of Engineering Services in connection with the design and construction of the Rattler Substation
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-161/approving an Engineering Services Contract with the Lower Colorado River Authority (LCRA) for provision of Engineering Services in connection with the design and construction of the Rattler Substation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 4:09:01 PM
Creation date
9/13/2019 1:47:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-161
Date
9/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Initial layout in state plane coordinates showing locations of proposed section <br />views <br />• Ultimate layout <br />B. Civil (10%) review of the following design submittals: <br />• Preliminary grading plan with erosion controls <br />• Preliminary access road/entrance layout <br />• Preliminary drainage plan with calculations <br />• Preliminary substation fence/gates layout <br />• Preliminary property fence/gates layout <br />C. Electrical (60%) review of the following design submittals: <br />• 10% deliverables noted above <br />• Project drawing list(s) <br />• Partially completed material list (all major equipment and most, if not all, <br />remaining material identified) <br />• Substation section views <br />• Substation grounding details <br />• Equipment vendordrawings <br />D. Structural (60%) review of the following design submittals: <br />• Footing layout <br />• Structural detail sheet(s) <br />• Footing detail sheet(s) <br />• Structural steel shipping list(s) <br />• Rebar cutsheet(s) <br />E. Civil (60%) review of the following design submittals: <br />• Boring Logs Sheet(s) <br />• Access Road/Entrance Layout <br />• Grading Plan <br />• Drainage Plan with calculations <br />• Substation Fence/Gates layout <br />• Property Fence/Gates layout <br />F. Relay and Control (10%) review of the following design submittals: <br />• Detailed Construction Document <br />• Relay one -lines <br />• Control Enclosure Layout <br />• AC/DC one -line <br />G. Relay and Control (60%) review of the following design submittals: <br />• 10% deliverables noted above <br />• Project drawing list(s) <br />• Completed panel assembly drawings <br />• Partially completed panel schematics (cable numbers can remain TBD at this <br />level) <br />• Partially completed panel wiring diagrams (cable numbers can remain TBD at <br />this level) <br />
The URL can be used to link to this page
Your browser does not support the video tag.