Laserfiche WebLink
• Initial layout in state plane coordinates showing locations of proposed section <br />views <br />• Ultimate layout <br />B. Civil (10%) review of the following design submittals: <br />• Preliminary grading plan with erosion controls <br />• Preliminary access road/entrance layout <br />• Preliminary drainage plan with calculations <br />• Preliminary substation fence/gates layout <br />• Preliminary property fence/gates layout <br />C. Electrical (60%) review of the following design submittals: <br />• 10% deliverables noted above <br />• Project drawing list(s) <br />• Partially completed material list (all major equipment and most, if not all, <br />remaining material identified) <br />• Substation section views <br />• Substation grounding details <br />• Equipment vendordrawings <br />D. Structural (60%) review of the following design submittals: <br />• Footing layout <br />• Structural detail sheet(s) <br />• Footing detail sheet(s) <br />• Structural steel shipping list(s) <br />• Rebar cutsheet(s) <br />E. Civil (60%) review of the following design submittals: <br />• Boring Logs Sheet(s) <br />• Access Road/Entrance Layout <br />• Grading Plan <br />• Drainage Plan with calculations <br />• Substation Fence/Gates layout <br />• Property Fence/Gates layout <br />F. Relay and Control (10%) review of the following design submittals: <br />• Detailed Construction Document <br />• Relay one -lines <br />• Control Enclosure Layout <br />• AC/DC one -line <br />G. Relay and Control (60%) review of the following design submittals: <br />• 10% deliverables noted above <br />• Project drawing list(s) <br />• Completed panel assembly drawings <br />• Partially completed panel schematics (cable numbers can remain TBD at this <br />level) <br />• Partially completed panel wiring diagrams (cable numbers can remain TBD at <br />this level) <br />