My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-161/approving an Engineering Services Contract with the Lower Colorado River Authority (LCRA) for provision of Engineering Services in connection with the design and construction of the Rattler Substation
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-161/approving an Engineering Services Contract with the Lower Colorado River Authority (LCRA) for provision of Engineering Services in connection with the design and construction of the Rattler Substation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 4:09:01 PM
Creation date
9/13/2019 1:47:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-161
Date
9/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Partially completed manifold schematics (cable numbers can remain TBD at this <br />level) <br />• Completed equipment vendor drawings <br />H. Full Package (90%) review to include: <br />• Full set of Electrical, Structural, Civil and R&C drawings. <br />• Completed grounding study and static coverage analysis/study reports. <br />• Overlay drawings of the initial layout, cable layout, and footing layout. <br />I. Full Package (IFC Ready Set) review to include: <br />• Full set of Electrical, Structural, Civil and R&C drawings addressing 90% <br />comments (PDFs only). <br />• Bid unit documentation. <br />J. Full Package (IFC Deliverable) review to include: <br />• Full sealed IFC set of Electrical, Structural, Civil and R&C drawings. <br />• Full set of AutoCAD Electrical, Structural, Civil, and R&C drawing files. <br />4. Engineering Consultant Description of Services: <br />The Engineering Consultant described in Section 3 will perform the design and associated work <br />for SMEU's scope of the Rattler Substation Addition project as defined in Attachment 2 <br />(Statement of Work for Engineering Services), <br />S. Assumptions: <br />The following assumptions were made in the development of the scope of services and <br />associated cost for this service: <br />• This scope of services is limited to Rattler Substation. <br />• All deliverables will be owned by SMEU. <br />• SMEU design inputs listed below will be required prior to the 60% review stage. <br />• SMEU will work directly with the City of San Marcos Development and Planning <br />department and provide information to LCRA on building fagade requirements. <br />• SMEU will interface with the City departments to ensure a suitable screening method <br />that also meets the City's architectural requirements and will provide the requirements <br />to LCRA. <br />• SMEU will furnish to LCRA the transformer design information necessary fordesign. <br />• SMEU will review and accept connection of storm water runoff to theneighboring <br />detention pond. <br />• SMEU will review and accept connection to existing water and wastewater lines outside <br />of the substation <br />• SMEU will review and accept control enclosure which includes: <br />o Partition to separate medium voltage metalclad switchgear <br />o Includes below grade cable vault <br />o Includes HVAC system, fire alarm <br />• SMEU will review and accept indoor, medium voltage distribution switchgear and feeder <br />design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.