Laserfiche WebLink
• Partially completed manifold schematics (cable numbers can remain TBD at this <br />level) <br />• Completed equipment vendor drawings <br />H. Full Package (90%) review to include: <br />• Full set of Electrical, Structural, Civil and R&C drawings. <br />• Completed grounding study and static coverage analysis/study reports. <br />• Overlay drawings of the initial layout, cable layout, and footing layout. <br />I. Full Package (IFC Ready Set) review to include: <br />• Full set of Electrical, Structural, Civil and R&C drawings addressing 90% <br />comments (PDFs only). <br />• Bid unit documentation. <br />J. Full Package (IFC Deliverable) review to include: <br />• Full sealed IFC set of Electrical, Structural, Civil and R&C drawings. <br />• Full set of AutoCAD Electrical, Structural, Civil, and R&C drawing files. <br />4. Engineering Consultant Description of Services: <br />The Engineering Consultant described in Section 3 will perform the design and associated work <br />for SMEU's scope of the Rattler Substation Addition project as defined in Attachment 2 <br />(Statement of Work for Engineering Services), <br />S. Assumptions: <br />The following assumptions were made in the development of the scope of services and <br />associated cost for this service: <br />• This scope of services is limited to Rattler Substation. <br />• All deliverables will be owned by SMEU. <br />• SMEU design inputs listed below will be required prior to the 60% review stage. <br />• SMEU will work directly with the City of San Marcos Development and Planning <br />department and provide information to LCRA on building fagade requirements. <br />• SMEU will interface with the City departments to ensure a suitable screening method <br />that also meets the City's architectural requirements and will provide the requirements <br />to LCRA. <br />• SMEU will furnish to LCRA the transformer design information necessary fordesign. <br />• SMEU will review and accept connection of storm water runoff to theneighboring <br />detention pond. <br />• SMEU will review and accept connection to existing water and wastewater lines outside <br />of the substation <br />• SMEU will review and accept control enclosure which includes: <br />o Partition to separate medium voltage metalclad switchgear <br />o Includes below grade cable vault <br />o Includes HVAC system, fire alarm <br />• SMEU will review and accept indoor, medium voltage distribution switchgear and feeder <br />design. <br />