My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-121
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2010 1:44:01 PM
Creation date
9/24/2009 2:12:19 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-121
Date
9/15/2009
Volume Book
183
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
requested by the Steering Committee and coordinated by the Program Manager. <br />4.7. Ecosystem Restoration Subcommittee. <br />The Ecosystem Restoration Subcommittee will provide support and information <br />requested by the Steering Committee and coordinated by the Program Manager. <br />4.8. Public Outreach Subcommittee. <br />The Public Outreach Subcommittee will provide support requested by the Steering <br />Committee and coordinated by the Program Manager. <br />4.9. Program Director. <br />The Program Director will participate in the decision-making meetings as may be <br />specifically requested by the Steering Committee. The Program Director will be expected to <br />bring to the attention of the Steering Committee questions and information relating to applicable <br />legal and procedural requirements. Consistent with the requirements of the POR, the Program <br />Director will manage the contracts of the Facilitator and other Supporting Personnel and will <br />handle the logistical arrangements for the Facilitator, coordinate the activities of the RIP during <br />the decision-making process, and serve as a liaison between the RIP and the Supporting <br />Personnel. <br />Section 5. Funding. <br />5.1. Grant and Appropriation. Part or all of the funding for development of the <br />Program Document will be from a Section 6 Habitat Conservation Planning Assistance Grant for <br />$1,063,250 from the Service and a 2010-2011 appropriation for support of the EARIP for up to <br />$1,692,500 from the 2009 Texas Legislature through the TWDB. <br />5.2. TWDB Process. The appropriation funding will be obtained from the TWDB <br />through a water research grant application process. The EARIP Steering Committee shall <br />designate an eligible entity to serve as the grant applicant and approve the application for the <br />appropriation funds from the TWDB and will enter into the grant fund contract with the TWDB <br />on behalf of the EARIP. <br />5.3. Funding Accountability. The Parties will implement measures to ensure <br />accountability in all expenditures and acknowledge the importance of pursuing eligible <br />cooperative and grant funding to the extent available from all state, federal, and other sources, <br />making efficient use of those funds. <br />Section 6. General Provisions. <br />6.1. Service Limitation. The Service is not required by State law to enter into this <br />Agreement. The Service can attend and participate in all decision-making meetings. The <br />Participants may, from time-to-time, request input from the Service regarding the application of <br />11212.03001/DFRO/MISC-3/1052172v.8 Page 6 of 20
The URL can be used to link to this page
Your browser does not support the video tag.