My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-187/approving an Interlocal Agreement with the Guadalupe-Blanco River Authority (GBRA) that provides for participation by GBRA in the costs for design and construction of storage, pumping and piping facilities and appurtenances that will enable
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-187/approving an Interlocal Agreement with the Guadalupe-Blanco River Authority (GBRA) that provides for participation by GBRA in the costs for design and construction of storage, pumping and piping facilities and appurtenances that will enable
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 11:11:10 AM
Creation date
10/16/2019 11:05:10 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-187
Date
9/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SMRWTP storage and pumping facilities as well as the SMRWTP Improvements that are <br />necessary to support the delivery and use of treated groundwater delivered from ARWA to the <br />City and GBRA. <br />(b) The various components of the Carrizo Facilities requiring construction <br />including a new storage tank; pumping facilities/equipment, associated electrical and control <br />instrumentation, metering equipment, and associated appurtenances and pipelines that will connect <br />the ARWA delivery pipeline to the plant storage and pumping systems are described in Exhibit A <br />attached hereto and incorporated by reference for all purposes. Exhibit A also includes their <br />relative capacities in the Carrizo Facilities described therein. <br />(c) The costs of the Additional Plant Improvements shall also be allocated as <br />reflected in Exhibit A. <br />2.03 Design. In consultation with GBRA, the City has awarded a professional <br />engineering services contract to Alan Plummer and Assoc. for design and construction phase <br />services (the 'Engineer") in an amount not to exceed $480,440.00 for the design of the SMRWTP <br />Improvements. The final plans and specifications developed by the Engineer for the SMRWTP <br />improvements will be subject to review and approval of GBRA. <br />2.04 Construction. Upon agreement between the authorized representatives of the <br />Parties, following approval by the Parties of the specifications and cost estimates under Section <br />2.03, the City will solicit bids for construction of the SMRWTP Improvements under applicable <br />municipal bidding procedures. The final bid price for any contract proposed to be awarded shall <br />be approved by the Parties, after which time the City shall initiate the process for award of the <br />construction contract by the San Marcos City Council. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.