Res 2019-187/approving an Interlocal Agreement with the Guadalupe-Blanco River Authority (GBRA) that provides for participation by GBRA in the costs for design and construction of storage, pumping and piping facilities and appurtenances that will enable
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-187/approving an Interlocal Agreement with the Guadalupe-Blanco River Authority (GBRA) that provides for participation by GBRA in the costs for design and construction of storage, pumping and piping facilities and appurtenances that will enable
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 11:11:10 AM
Creation date
10/16/2019 11:05:10 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-187
Date
9/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.05 Cost Participation, Adjustments in Cost, and Payment. <br />(a) Cost Participation. GBRA agrees to share in the costs for professional <br />engineering services provided by the Engineer for and the costs for construction of the SMRWTP <br />Improvements. Design costs for the pump station by the sub -consultant HDR will be paid for <br />solely by GBRA. The remaining costs for engineering services for SMRWTP Improvements will <br />be apportioned between the City and GBRA based upon the amounts shown in Exhibit A, attached <br />hereto and made a part hereof. In conjunction with the development of construction plans and <br />specifications, each bid line item will be paired with a corresponding percentage allocation <br />between the City and GBRA ("Bid Line Percentage Allocation"). Prior to bidding, estimated <br />construction costs will be provided for approval by GBRA. Based upon the awarded construction <br />contract, the Bid Line Percentage Allocations shall be used to determine construction cost <br />allocation between the City and GBRA. <br />(b) Adjustments in Cost. The actual amount payable by GBRA under this <br />section may be adjusted based upon actual authorized costs charged by the Engineer or the <br />contractor for construction pursuant to the terms of the construction contract awarded by the City, <br />applying the same methodology described above. <br />(c) Payment. GBRA will pay any amounts due within 30 days after receipt of <br />an invoice from the City for costs incurred by the City for professional services provided by the <br />Engineer, together with invoices from the Engineer to the City for services performed. GBRA <br />represents that it has obtained sufficient financing to cover its estimated share of the SMRWTP <br />Improvements. Before Notice to Proceed is given for construction, GBRA will deposit with the <br />City GBRA's proportionate share of the contract amount, such that the City's financial obligation <br />may be fully funded. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.