Laserfiche WebLink
i4W, <br />T R A\ C E <br />Enhanced sidewalks and pedestrian access are provided throughout the Trace project. <br />0 6 foot bike lane with a z foot striped and textured buffer between traffic lane and bike <br />lane <br />0 6'-12' foot meandering hike and bike trails through the Environmental Buffer Trail <br />System and the Open Space Electrical Easement <br />• 5 foot sidewalk around the school and central park sites <br />0 6 foot sidewalk along Street Section CC <br />• 12 foot shared pedestrian and bike path sidewalk along Street Sections AA, BB and <br />through the center of CC <br />• 4 foot sidewalk throughout the residential neighborhoods <br />• 5 foot sidewalks along Posey Road and Old Bastrop Highway with a 7' street tree area <br />Illustration 18: Key Map to Street Cross Sections <br />Illustration 19: Enhanced Residential Street (Standard) <br />Sin&-FarnVy ` , w s Rug na c�.o��s Single-l'—fly <br />side—Ilk /I Travel Lane S dlewgllk <br />Street (FOC -FOC) Street <br />Tree T— <br />.... 12 -30. Area..... 52 Area 2'-30' <br />FrontYard ROW Front Yard <br />Setback Setback <br />(Depending on Lot Width) (Depending on Let Width) <br />29 <br />