Laserfiche WebLink
SAN MARCOS DESIGN MANUAL <br />�����I�U��^ �U�����K� �U���U�����U��K 8��� <br />��n : �n���x�� x~. n no.� v ��v���� ��x~, n nx�^� : ^���n��u-�o:��.� <br />(- <br />ARTICLE �' �T]�hJ[����F�� ��1�� ��| ||| F1A |yJ�� ���A! SUSTAINABILITY <br />^`... .~~�� ^^. ^^.'"."^,^^.^`.^^ FOR .�.�.�^~��...�^~ FOR <br />Section K.G.1.@Solar Panels <br />A. General. Prior Loinstalling so|artechno|ogyon-site try improving the energy efficiency ofthe structure through <br />other passive methods such oyawnings, and screens. When placing solar panels on'yite,consider the impact that <br />the technology will have on the historic character and fabric of the site. Consider the following locations prior to <br />requesting the installation ufsolar technology onhistoric structures: <br />1. Pole mounted below the fence line <br />2. Non -historic structure onthe site <br />B. If the desired energy efficiency cannot be achieved in the above locations then consider the following location: <br />1. Historic Accessory Structures <br />C. If the desired energy efficiency cannot be achieved by placing solar technology in the above three areas, and the <br />technology must be place on the historic structure, then the following locations should be considered in the order <br />listed below. <br />1. Non-visible roof slope <br />2. Rear roof slope <br />3. Rear portion ofside orsecondary roof slope <br />4. Side orsecondary roof slopes <br />S. Front orprimary roof slope <br />k4-a.d44N)4-,--9�oIar panels installed on the main structure should conform to the slope of the roof and not extend <br />past the ridge line or eave line of the roof. <br />S Marcos City <br />Code <br />°J f Ordinances <br />47 Chapter 8G-Ud|ities,Article 4-E|extrcity Division 4-UndarQroundElectric Utilities, Sec. 8G18Q.-Standards for <br />development. <br />-/a\Anynew deve|upmen <br />| <br />Lb <br />JefAq_yjedevelopment that encroaches upon existing overhead electric infrastructure will be required to convert to <br />underground electric infrastructure along the entire frontage of the property or development adjacent to the <br />easement or public right-of-way in which the infrastructure is in, and located to a point atwhich extensions and <br />connections to future subdivisions or developments can be made. If the property or development is not adjacent to <br />an easement or public right-of-way, the extension of electric lines shall be accomplished in such a manner as to a|\oxv <br />future extensions and connections to new subdivisions or developments. |fnew subdivisions or developments cannot <br />be constructed beyond the applicant's property due to physical or legal constraints, the director or his or her de if <br />may waive this requirement. <br />| fcl|n order to maintain electric system the developer shall pay all costs associated with upgrading <br />any electric utility infrastructure necessary to serve new or increased electric load resulting from any new <br />development or redevelopment within the San Marcos Electric Utility service area. <br />(b,d)Design and construction standards for overhead and underground electric utility infrastructure <br />the it <br />| <br />limits are available from the Enoineerine Deoartrnentfrom the Service Provider in the area. <br />L� �EU Service Standards manual. <br />INOTES: Removal of "e" which is duplicated in the SMEU Service Standards Manual I <br />Exhibit B Pg. 28 of 27 <br />