My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2019-045/amending various sections of the City's development code, address typographical and technical errors, implement recommendations of the HPC to restrict the painting of masonry in the Downtown Historic District, etc.
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2019
>
Ord 2019-045/amending various sections of the City's development code, address typographical and technical errors, implement recommendations of the HPC to restrict the painting of masonry in the Downtown Historic District, etc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 9:28:05 AM
Creation date
1/28/2020 9:23:35 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
2019-45
Date
12/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SAN MARCOS DESIGN MANUAL <br />�����I�U��^ �U�����K� �U���U�����U��K 8��� <br />��n : �n���x�� x~. n no.� v ��v���� ��x~, n nx�^� : ^���n��u-�o:��.� <br />(- <br />ARTICLE �' �T]�hJ[����F�� ��1�� ��| ||| F1A |yJ�� ���A! SUSTAINABILITY <br />^`... .~~�� ^^. ^^.'"."^,^^.^`.^^ FOR .�.�.�^~��...�^~ FOR <br />Section K.G.1.@Solar Panels <br />A. General. Prior Loinstalling so|artechno|ogyon-site try improving the energy efficiency ofthe structure through <br />other passive methods such oyawnings, and screens. When placing solar panels on'yite,consider the impact that <br />the technology will have on the historic character and fabric of the site. Consider the following locations prior to <br />requesting the installation ufsolar technology onhistoric structures: <br />1. Pole mounted below the fence line <br />2. Non -historic structure onthe site <br />B. If the desired energy efficiency cannot be achieved in the above locations then consider the following location: <br />1. Historic Accessory Structures <br />C. If the desired energy efficiency cannot be achieved by placing solar technology in the above three areas, and the <br />technology must be place on the historic structure, then the following locations should be considered in the order <br />listed below. <br />1. Non-visible roof slope <br />2. Rear roof slope <br />3. Rear portion ofside orsecondary roof slope <br />4. Side orsecondary roof slopes <br />S. Front orprimary roof slope <br />k4-a.d44N)4-,--9�oIar panels installed on the main structure should conform to the slope of the roof and not extend <br />past the ridge line or eave line of the roof. <br />S Marcos City <br />Code <br />°J f Ordinances <br />47 Chapter 8G-Ud|ities,Article 4-E|extrcity Division 4-UndarQroundElectric Utilities, Sec. 8G18Q.-Standards for <br />development. <br />-/a\Anynew deve|upmen <br />| <br />Lb <br />JefAq_yjedevelopment that encroaches upon existing overhead electric infrastructure will be required to convert to <br />underground electric infrastructure along the entire frontage of the property or development adjacent to the <br />easement or public right-of-way in which the infrastructure is in, and located to a point atwhich extensions and <br />connections to future subdivisions or developments can be made. If the property or development is not adjacent to <br />an easement or public right-of-way, the extension of electric lines shall be accomplished in such a manner as to a|\oxv <br />future extensions and connections to new subdivisions or developments. |fnew subdivisions or developments cannot <br />be constructed beyond the applicant's property due to physical or legal constraints, the director or his or her de if <br />may waive this requirement. <br />| fcl|n order to maintain electric system the developer shall pay all costs associated with upgrading <br />any electric utility infrastructure necessary to serve new or increased electric load resulting from any new <br />development or redevelopment within the San Marcos Electric Utility service area. <br />(b,d)Design and construction standards for overhead and underground electric utility infrastructure <br />the it <br />| <br />limits are available from the Enoineerine Deoartrnentfrom the Service Provider in the area. <br />L� �EU Service Standards manual. <br />INOTES: Removal of "e" which is duplicated in the SMEU Service Standards Manual I <br />Exhibit B Pg. 28 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.