.. <br />f <br />CHANGE ORDER #5 <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT: Post Road Paving and Drainage Improvements and Sink <br />Creek Interceptor Project <br />CONTRACTOR: Texas Sterling Construction L.P. <br />ORIGINAL CONTRACT DATE: July 31, 2006 <br />CHANGE ORDER DATE: January 30, 2008 <br />WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SFRVTC"Fq <br />Item <br />No. <br />Est. <br />Qt . <br />Unit <br />Description <br />Unit Price <br />Total <br />Add /Deduct <br />Quantity Overruns agreed to by City Inspector <br />65 <br />1 <br />EA <br />Fire Hydrant <br />$2,300.00 <br />$2,300.00 <br />66 <br />3 <br />EA <br />8" Resilient Wedge Gate Valve, <br />including final adjustment for top of <br />valve <br />$900.00 <br />$2,700.00 <br />Quantity Overruns a reed to by City Inspector <br />64 <br />390 <br />LF <br />Replace l" Water Service <br />$33.00 <br />$12,870.00 <br />67 <br />8 <br />EA <br />6" Resilient Wedge Gate Valve, <br />including final adjustment for top of <br />valve <br />$600.00 <br />$4,800.00 <br />Asp halt tapers at North and South End of Project <br />98a <br />1 370.5 <br />SY <br />I Hot Mix Asphaltic Concrete Pavement <br />$52.50 <br />$19,451.25 <br />Lime Kiln 24 "x16" waterline stubout <br />67a <br />I <br />LS <br />24 "x16" Tapping sleeve and valve <br />$21,722.00 <br />$21,722.00 <br />58b <br />60 <br />LF <br />16" D.I. CL 250 waterline, all depths <br />$124.00 <br />$7,440.00 <br />65a <br />1 <br />EA <br />2" Blow -off Valve <br />$3,000.00 <br />$3,000.00 <br />Additional concrete driveways for Post Road Lots 1513, 1539, 1543 and 1547 <br />107 1 <br />925 1 SF <br />Concrete Driveways (Type I <br />$6.00 <br />$5,550.00 <br />Total: <br />$79,833.25 <br />Previous contract amount: <br />$ <br />8,299,278.16 <br />Net increase / deerease in contract amount: <br />$ <br />79,833.25 ✓ <br />Revised contract amount: <br />$ <br />8,379,111.41 ✓ <br />Previous contract time of completion (substantial /final) <br />783 <br />/ 843 days <br />Net increase /decrease in contract time of completion <br />days <br />Revised contract time of completion (substantial /final) <br />783 <br />/ 843 days <br />