My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2020-169/approving a change order to the Design-Build Construction Contract with JE Dunn Construction relating to the renovation of the San Marcos Public Library for the addition of a 65,000 gallon rainwater collection system in the net increase amou
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2020
>
Res 2020-169/approving a change order to the Design-Build Construction Contract with JE Dunn Construction relating to the renovation of the San Marcos Public Library for the addition of a 65,000 gallon rainwater collection system in the net increase amou
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2020 10:25:43 AM
Creation date
8/26/2020 10:15:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
2020-169
Date
8/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2020-169R <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN <br />MARCOS, TEXAS APPROVING A CHANGE ORDER TO THE DESIGN - <br />BUILD CONSTRUCTION CONTRACT WITH JE DUNN <br />CONSTRUCTION RELATING TO THE RENOVATION OF THE SAN <br />MARCOS PUBLIC LIBRARY FOR THE ADDITION OF A 65,000 <br />GALLON RAINWATER COLLECTION SYSTEM IN THE AMOUNT OF <br />$247,813.14 BRINGING THE TOTAL CONTRACT PRICE TO <br />$13,134,113.14; AUTHORIZING THE CITY MANAGER OR HIS <br />DESIGNEE TO EXECUTE THE APPROPRIATE DOCUMENTS <br />RELATING TO THE CHANGE ORDER ON BEHALF OF THE CITY; AND <br />DECLARING AN EFFECTIVE DATE. <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN MARCOS, <br />TEXAS: <br />PART 1. A Change Order to the design -build construction contract with JE Dunn <br />Construction relating to the renovation of the San Marcos Public Library for the addition of a <br />65,000 gallon rainwater collection system in the amount of $247,813.14 bringing the total contract <br />price to $13,134,113.14 is approved. <br />PART 2. The City Manager or his designee is authorized to execute appropriate <br />documents related to the change order on behalf of the City. <br />PART 3. This resolution shall be in full force and effect immediately from and after <br />its passage. <br />ADOPTED on August 18, 2020. <br />Jane Hughson <br />Mayor <br />JamAAttst:my Cook <br />Interim City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.