Laserfiche WebLink
SAN MARCOS TRANSIT PLAN I FINALREPORT <br />City of San Marcos <br />City of San Marcos Transit and Paratransit Fleet <br />The five -phase service plan is recommendedto be implemented over a five-year period, however, <br />budget constraints mayrequire a longer implementation timeframe. <br />The followingtable provides a ye ar-by-year vehicle expansion and replacement counts over the <br />next 12 years. Heavy-dutY30'b uses are assumedto cost $350,000 andhave a life span of 12 <br />years. Light- duty 25' cut away vehicles are assumed to cost $ ioo, 000 and have a life span of 5 <br />years. Vehicle costs are not adjusted for inflation. The City contribution assumes a 20% local <br />match. <br />City of San Marcos Fleet Expansion and Replacement Schedule and Costs <br />Nelson\Nygaard Consulting Associates, Inc. 15-3 <br />.�r <br />,rte izsss�dra <br />i iii /�' <br />rt� , <br />aaa�r <br />r�rsiris� <br />/ <br />�i <br />�,,, <br />, i iii iii/;;,,, <br />MIN i " i i <br />" <br />iii , <br />= i i W <br />;;;; ., <br />'/ ;Wq"#i <br />L <br />11 111 <br />� 1 111 <br />��©� <br />1 <br />1111........ <br />1111....... <br />® <br />1 • �� <br />1 <br />1111........ <br />1111....... <br />®��� <br />1 <br />'...11111........ <br />'...11111....... <br />' 11111 <br />111111=1 <br />Nelson\Nygaard Consulting Associates, Inc. 15-3 <br />