Laserfiche WebLink
SAN MARCOS TRANSIT PLAN I FINALREPORT <br />City of San Marcos <br />Infrastructure Improvements <br />Cost estimates for select recommended infrastructure improvements are based on industry <br />averages. Cost estimates provided do not include utility relocation or construction. Cost estimates <br />are not provided for new crosswalks or traffic improvements due to the wide range of costs <br />associatedwith design, engineering, and construction. <br />Infrastructure Improvement Costs <br />/� ro i <br />of , i <br />1/0SheltersNew <br />Level 1 Bus Stop Accessibility Improvements <br />48 existing stops <br />new .. <br />8 existing stops <br />Leve12 Bus Stop Accessibility Improvements <br />new .. <br />Level 3 Bus Stop Accessibility Improvements <br />4 existing stops <br />new .. <br />Dedicated Left Turn Phase and Signal <br />Ism <br />New Traffic Signal <br />Ism 111011� <br />Right Turn Bus Exemption <br />„ <br />a <br />Ism <br />Nelson\Nygaard Consulting Associates, Inc. 15-5 <br />