Laserfiche WebLink
SAN MARCOS TRANSIT PLAN I FINALREPORT <br />City of San Marcos <br />Downtown Transit Plaza <br />Cost estimates for construction of the proposed Downtown Transit Plaza are based on the 2018 <br />San Marcos CIP and industry averages. Cost estimates donot include design, engineering, or <br />construction contingencies. <br />Downtown Transit Plaza Cost Estimates <br />5 2018 San Marcos CIP <br /><http://sanmarcostx.gov/DocumentCenter/View/l 0816/Appendix-I --- Capital- Improvements- Plan?bidld=> <br />SDOT Real -Time Info Signs <br /><https://www.seattle.gov/trans po rtation/pro jects -and-programs/programs/transit- program/real-time-info rmation- <br />signs> <br />San Antonio Crosswalk <br /><https://news4sananto nio.com/news/trouble-shoote rs/breaking-down-the-cost-of-the-new- rain bow -crosswalk> <br />PedBike U Rack <br /><http://www.pedbikeinfo.org/cros/down Ioads/Co unte rmeasure%20Costs_Re po rt_Nov201 3.pdf> <br />Nelson\Nygaard Consulting Associates, Inc. 15-6 <br />