My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-064/approving Substantial Amendment No. 10 to the Community Development Block Grant-Disaster Recovery (CDBG-DR) Action Plan
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-064/approving Substantial Amendment No. 10 to the Community Development Block Grant-Disaster Recovery (CDBG-DR) Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 3:25:55 PM
Creation date
4/29/2021 1:51:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-64
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
559
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Note: Elevation will be required if rehab costs reach 50% of appraised preflood home value <br />Single Family Owner Occupied Reconstruction <br />$196,000 <br />Buyout to Convert to Greenspace or Limited Use <br />$250,000 <br />Acquisition for Redevelopment <br />$250,000 <br />Elevation Only (with minimal interior rehab) <br />$50,000 <br />Single Family Rental Rehabilitation (1-4 Unit) <br />no elevation <br />$45,000 <br />with elevation <br />$60,000 <br />Single Family Rental Reconstruction w/ elevation <br />(1-4 Unit) <br />$196,000 <br />D. Infrastructure <br />The City will designate $12.5 million to infrastructure projects that will alleviate repetitive loss, <br />inundation, and recurring flooding. Any match funding activities will be compliant with CDBG-DR <br />eligibility requirements as well as other federal regulations that may apply. Activities undertaken will <br />focus on projects under the FEMA Public Assistance Categories as listed in the Needs Assessment above, <br />as well as address the Hazard Mitigation measures designed to reduce future repetitive losses. Eligible <br />projects (defined by the Category they may fall under) may include but are not limited to: The projects <br />highlighted in the blue color are projects that will be implemented using CDBG DR funds as directed by <br />City Council. <br />A. Debris Removal (none proposed as this is an immediate Disaster Recovery level activity and not <br />eligible for CDBG-DR funds); <br />B. Emergency Protective Measures; <br />a. Develop early warning systems <br />b. Deploy Reverse Callback systems <br />c. Construct Flood gates and barriers <br />C. Road Systems and Bridges; Midtown, Clarewood/Barbara (Activity Terminated), Blanco Gardens, <br />(Mand Projects <br />a. Culvert repair/replacement <br />b. Drainage ditch repair/replacement <br />c. At risk road segment repair/replacement <br />d. Bridge repair/replacement <br />D. Water Control Facilities; <br />E. Repairs to water treatment plants <br />F. Buildings, Contents, and Equipment; <br />Last Updated 3/03/20 Page 53 of 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.