My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-064/approving Substantial Amendment No. 10 to the Community Development Block Grant-Disaster Recovery (CDBG-DR) Action Plan
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-064/approving Substantial Amendment No. 10 to the Community Development Block Grant-Disaster Recovery (CDBG-DR) Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 3:25:55 PM
Creation date
4/29/2021 1:51:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-64
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
559
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G. Repair and replacement ofCity owned buildings, equipment, facilities and vehicles ifnot covered <br />by insurance or another funding source <br />H. Utilities; Midtown, Clarewood /Barbara (Activity Terminated), Blanco Gardens, Uh|and Projects <br />a. Storm sewer system upgrades <br />b. Creation ofnew drainage systems and lines <br />Parks, recreation and other facilities; and <br />Hazard Mitigation activities, including land acquisition: Blanco Riverine Improvements <br />The City may also elect to participate in a U.S. Army Corps of Engineers projectsaswell bycontributing <br />the Chiefs Report, with amax contribution of$Z5U,UUU.UU but specific projects under this Activity <br />have not currently been identified. <br />Potential flood recovery projects were included within the 1U'yearCapital Improvement Plan adopted <br />by City Council and are attached in Appendix J. The projects were identified through the unmet needs <br />process and are all located in the area most impacted by the floods and in census tracts meeting LMI <br />requirements. The list includes anticipated funding needs and project schedules. <br />Using HUD -DR planning funds, a Feasibility Study was conducted to prioritize the infrastructure <br />projects. The privatization matrix included, in order of most important and that will have the most <br />positive impact on the community: <br />* Impact tolow tomoderate income population; <br />* Reduction inwater surface elevations; <br />* Benefit tocost ratios� <br />* Permitting requirements and ability to achieve project completion within funding timeframes; <br />* Environmental Impacts; <br />* Ability to qualify for additional funding sources; <br />* Creation ofemergency access routes; and <br />* Phasing considerations. <br />Substantial Amendment No. 2 and Substantial Amendment No. 4 were drafted detailing the description <br />of infrastructure projects and the use of infrastructure dollars under this grant. Seethe Prioritization <br />Matrix in Appendix J along with the Infrastructure Project Budgets and Project Descriptions. The City <br />will be responsible for implementation of the infrastructure projects through the use of City staff and <br />procured professional services. <br />PrhoritizetionResuks@&Renhjng-TopProjects <br />• KMidtmwn/AqueneneSphngs <br />• Blanco Gardens <br />• C|enevvood/BerbenaDrive <br />• Uh|endRoed <br />• B|encoRiverine <br />Last Updated 3/U3/ZU Page 54of63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.