My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-069/approving the San Marcos Regional Airport Master Plan to guide the Airport’s future development and operations
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-069/approving the San Marcos Regional Airport Master Plan to guide the Airport’s future development and operations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 9:36:32 AM
Creation date
5/11/2021 1:17:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-69
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIRPORT MASTER PLAN <br /> <br /> <br />C HAPTER 5: A LTERNATIVES <br />I NTRODUCTION <br />This chapter describes the various runway/approach, taxiway, land-use, and ramp <br />re-development alternatives that were created based on the needs defined in the <br />Facility Requirements Chapter. This chapter also: <br /> Discusses the evaluation process used to select the preferred development <br />alternative for each area; <br /> Reviews the results of the evaluation process; and, <br /> Provides an overview of the anticipated environmental impacts of the <br />consolidated preferred development alternatives. <br />A LTERNATIVES D EVELOPMENT AND E VALUATION P ROCESS <br />The various alternatives described in this chapter were created by reviewing the <br />facility requirements defined in Chapter 4 and devising numerous development <br />options that could potentially satisfy those requirements. These preliminary <br />development alternatives were then consolidated into: <br /> 3 Runway/Approach Alternatives <br /> 3 Taxiway Alternatives <br /> 4 Land-Use Alternatives <br /> 3 Ramp Re-Development Alternatives <br />These alternatives were then formally evaluated using the processes described in <br />the remainder of this chapter. <br /> system. Typically, the <br />location and development of all other infrastructure at an airport (e.g. taxiways, <br />ramps, hangars, etc.) is based on the layout of the runways. As a result, the <br />alternatives were reviewed and evaluated in the order described below with a <br /> <br />Alternatives Chapter Page 1of 60 <br />October 2020 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.