My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-069/approving the San Marcos Regional Airport Master Plan to guide the Airport’s future development and operations
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-069/approving the San Marcos Regional Airport Master Plan to guide the Airport’s future development and operations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 9:36:32 AM
Creation date
5/11/2021 1:17:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-69
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIRPORT MASTER PLAN <br /> <br /> The establishment of a full-length east side parallel taxiway for Runway <br />17/35. <br /> Establishment of a partial parallel taxiway for Runway 17/35 to reduce ROT <br />and reduce taxi distances to the approach end of Runway 17. <br /> The northeastern extension of Taxiway Echo to connect with the new partial <br />parallel taxiway for Runway 17/35. <br /> A new crossing point for Runway 13/31 to reach the partial parallel taxiway <br />system for Runway 17/35 (identified as Taxiway Foxtrot). <br /> A new taxiway exit for aircraft landing on Runway 31 (identified as Taxiway <br />November). <br /> Closure of Taxiway Alpha and Juliet at the approach end of Runway 8. <br /> Resolves all non-compliant taxiway configuration issues with the exception of <br />the direct ramp to runway access related to Taxiways Echo and Foxtrot which <br />will be resolved with surface painted no-taxi islands as part of the ramp <br />redevelopment alternatives. <br /> Provides for the ultimate strengthening of the taxiway system to 175,000 <br />pounds DW. <br /> Upgrade of taxiway system to meet TDG 3 standards and ultimately TDG 5 <br />standards. <br /> Includes the installation of surface painted taxiway location and directional <br />signs related to the Taxiway Alpha and Charlie intersections where pilots <br />have missed the turn-off from Taxiway Alpha when taxing northbound on <br />Taxiway Charlie. <br /> Includes the development of engine run-up areas at the approach end of <br />Runway 17, 31 and 35. <br />Taxiway Alternative #2 is shown in Figure 5-7. <br />Taxiway Alternative #3 <br />Taxiway Alternative #3 is identical to Taxiway Alternative #2 with the exception of <br />two changes: <br /> <br />Alternatives Chapter Page 22 of 60 <br />October 2020 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.