My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-057R/Approving the award of a contract with Walker Partners LLC. for design and admin engineering services
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-057R/Approving the award of a contract with Walker Partners LLC. for design and admin engineering services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 4:35:06 PM
Creation date
4/18/2022 12:01:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT 1 <br />CITY OF SAN MARCOS <br />Center Point Water Line Extension <br />SCOPE OF SERVICES <br />5. As -built Survey —Visible Features of Water Line Installed: Walker Partners will mobilize for one <br />day in the field and prepare a survey of the visible features of the water line installed above <br />ground, for preparing Record Drawings. Walker Partners will prepare an electronic map showing <br />the following: <br />a. Shot at top of nut of water valves. <br />b. Identify all visible and above ground water appurtenances and meters. <br />Schedule <br />The following project milestones are estimated and may require modification pending preliminary <br />engineering results and construction permitting constraints: <br />• 30% Design Documents Submittal (90 calendar days) <br />• 60% Design Documents Submittal (45 calendar days) <br />• 90% Design Documents Submittal (30 calendar days) <br />• 100% Design Documents Submittal (15 calendar days) <br />The estimated timeframes identified do not include time for City review of submittals. <br />City Responsibilities <br />1. The City will provide to Walker Partners all data in the City's possession relating to Walker <br />Partners' services on the Project. Walker Partners will reasonably rely upon the accuracy, <br />timeliness, and completeness of the information provided by the City. <br />2. The City will give prompt notice to Walker Partners whenever the City observes or becomes <br />aware of any development that affects the scope or timing of Walker Partners' services. <br />3. The City will examine information submitted by Walker Partners and render in writing or otherwise <br />provide comments and decisions in a timely manner. <br />4. The City will obtain all necessary right -of -entries from required landowners. <br />5. The City will provide Title Reports for properties with proposed easements. <br />6. The City will obtain all permanent water line, access, and temporary construction easements, <br />including services such as appraisal of properties, negotiations with the property owners, and <br />actual purchase of the easements. <br />7. The City will provide on-site construction observation services during the construction phase and <br />will confirm the accuracy of the Contractor's as -built red lines. <br />8. The City will provide Subsurface Utility Engineering, if necessary. <br />9. The City will provide a geotechnical data report containing construction recommendations for <br />open trench construction. Number of soil borings to be determined by geotechnical engineer <br />procured by the City. <br />10. The City will provide a soil corrosion analysis with recommendations for corrosion protection, if <br />necessary. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.