Confidential - Do not duplicate or distribute without written permission from Knight Security <br />KSS will perform acceptance testing in the presence of the appointed Customer representative to ensure proper <br />operation and communication of all integrated systems. A test sheet with a check list for each device will be provided by <br />KSS and signed by the Customer representative upon successful completion of a system acceptance test. The final <br />system test report will be sent to all parties. <br />A punch list detailing items requiring a follow up that is within this scope of work will be created. KSS will correct the <br />punch list items in a mutually agreed upon time. If the Customer wants something changed after the test sheet has been <br />signed additional charges will be applied. <br />Upon system acceptance, a KSS job completion form shall be signed and sent to all parties. It is the Customer's <br />responsibility to ensure proper periodic testing per the manufacturer's recommendation if a signed SecurePlan <br />agreement is not in place. <br />Training - Training is not included with this proposal. If the customer requests, training can be added as a change order <br />Standard Proposal Notes: <br />1. This proposal will follow the guidelines stated in DIR contract number DIR-CPO-4494 Standard Terms and <br />Conditions. <br />2. This proposal is valid for 15 days. After the 15 days the quote is no longer valid and a new quote needs to be <br />regenerated and prices may vary. <br />3. A standard 1 year warranty applies on all newly installed equipment. <br />4. Please allow 6-8 weeks lead time for hardware. <br />5. Final Location of all equipment to be approved by owner prior to start of installation. <br />6. Work provided by KSS is assumed to be continuous, unhindered and without the need for escorts. Additional costs <br />will be incurred if work is slowed by denial or delay of access to the work areas without three days' notice, or if <br />escorts are required at any time. Any cessation of work by the customer or delays in the project construction <br />schedule will result in additional mobilization and project management charges. <br />7. The quantities of materials noted above scope of work are intended to be descriptive. Should there be any <br />discrepancy between the scope of work and the equipment list, the equipment list will supersede the scope of work <br />stated above. <br />8. All work will be done following federal, state, and local laws and requirements for the above scope of work. <br />9. Due to extreme supply chain issues, Knight Security reserves the right to adjust final proposal pricing until an order <br />is placed with our manufacturer partners. We will inform you within 5 business days of receipt of order about product <br />availability and price increases greater than Knight can absorb. <br />Knight Security Systems Excludes the Following: <br />1. All 120 VAC connections are to be performed by customer or customer's designated licensed Electrical contractor. <br />2. Fire alarm interface, cabling, connection, input/output, testing and certification. <br />3. Any city or other governmental permits, not associated with this scope of work, required for the use and operation of <br />the system. <br />4. Access to device location, penetrations, required access panels for concealed areas. <br />5. If not stated above wire mold, conduit, trenching, wireless devices or aerial cabling necessary to connect any <br />remote locations or gates, computer workstations to operate the system, and network equipment to provided power <br />and data communication for devices. <br />6. Overtime required due to schedule revisions, work stoppages, delays caused by others, or circumstances beyond <br />Knight Security Systems control. <br />7. Final terminations and connections to equipment other than provided by Knight Security Systems. <br />8. Any trade installation that Knight Security Systems is not licensed to perform. <br />9. Painting, patching or landscaping required as a result of the installation of equipment associated with this scope of <br />work. <br />10. Technical assistance or the setup of the customer's network for connection to the security control systems. The <br />customer is required to provide static IP addresses and support personnel for assistance in setting up the network <br />connections. <br />Roles & Responsibilities <br />Client Initials: <br />3/7/2022 ( Proposal # 16954-1-0 1 COSM-Activity Center Security v3 KNIGHT <br />SECURMY SYSTEMS <br />HCTIOAIMEGAT'G£gVIC'e - <br />