Laserfiche WebLink
Essential activities conducted in the course of project by the Customer and Knight Security Systems (KSS). <br />Project Administration Tasks <br />Customer <br />KSS <br />General project management & administration <br />X <br />X <br />Designate primary customer point of contact and site supervisor <br />X <br />X <br />Host initial site orientation and kick-off meeting <br />X <br />X <br />Pre -installation walk-through and design verification <br />X <br />X <br />Pre -construction utility assessment <br />X <br />System design and engineering <br />X <br />System design and engineering approval <br />X <br />X <br />Develop master project schedule <br />X <br />Approval of master project schedule <br />X <br />X <br />System design acceptance within overall master plan of larger facility <br />X <br />X <br />Provide lists of existing equipment and building drawing backgrounds <br />X <br />X <br />Develop and maintain drawings and equipment schedules <br />X <br />X <br />Provide written communication regarding work site conditions <br />X <br />X <br />Coordinate month) in -progress reviews for active sites <br />X <br />Change order management <br />X <br />Project Installation Tasks <br />Customer <br />KSS <br />Provide locations for materials staging <br />X <br />X <br />Materials re -installation configuration and delivery <br />X <br />X <br />Pre -installation testing of existing equipment <br />Confi ure client workstations to the security system <br />X <br />Installation of device power supplies <br />X <br />120VAC at each device location where needed <br />X <br />Building penetrations to exterior <br />X <br />Fire partition penetrations and sealing <br />X <br />Installation of conduit to security system devices where needed <br />X <br />Installation of cables to security system devices <br />X <br />Network cables from security system devices to copper patch panels <br />X <br />Patch cables between patch panels and network switches <br />X <br />Create panel, cable, and equipment labelin scheme <br />X <br />Install cable labels per labeling scheme <br />X <br />Network Tasks <br />Customer KSS <br />Rack and racks ace for rack mount equipment <br />X <br />Network PoE switches and configuration <br />X <br />Patch panels and uninterru table power supply <br />X <br />IP address assignment for security system equipment and workstations <br />X <br />Confi ure client workstations to the security system <br />X <br />Programming Tasks Customer KSS <br />Create custom security system programming matrix X <br />Program initial security system configuration X <br />Develop and implement database update procedure X <br />Testing and Acceptance Tasks <br />Customer KSS <br />System test forms and checklists <br />X <br />Fulls stem test <br />X <br />Customer on -sites stem acceptance <br />X <br />As -built drawings and final engineering document submittal <br />X <br />3/7/2022 1 Proposal # 16954-1-0 1 CoSM-Activity Center Security v3 <br />Client Initials: <br />KNIGHT <br />SCCURITY SYSTEMS <br />HGWOP.� IIY9EG9RY� SEWJICE <br />