My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-154R/approving a professional services agreement with Freese and Nichols, Inc. for an update to the City’s Wastewater Master Plan in the not to exceed amount of $696,480.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-154R/approving a professional services agreement with Freese and Nichols, Inc. for an update to the City’s Wastewater Master Plan in the not to exceed amount of $696,480.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 2:01:30 PM
Creation date
8/29/2022 4:38:11 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2022-154R
Date
8/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT 2 <br /> DETAILED FEE SCHEDULE <br /> Task Task Name Task Fee Subtask <br /> Fee <br /> A Project Management $29,617 <br /> A-1 Project Kickoff Meeting $7,914 <br /> A-2 Data Collection $6,715 <br /> A.3 Project Management Activities $14,988 <br /> B Population and Wastewater Flow Projections $30,517 <br /> B.1 Evaluate Historical Population and Wastewater Flow Data $8,480 <br /> B.2 Evaluate Future Service Areas and Develop Wastewater Flow <br /> Projections $12,309 <br /> B.3 Progress Meeting#1 ( $3,071 <br /> B.4 Wastewater Flow Projections Technical Memorandum $6,657 <br /> C Wastewater Model Development and Calibration $210,667 <br /> CA Flow Meter Preparatory Work $2,217 <br /> C.2 Temporary Flow Meter Installation and Data Collection $125,883 <br /> C.3 Flow Data Analysis and Evaluation $4,592 <br /> C.4 1/1 Characterization and Ranking $6,593 <br /> C.5 Wastewater Model Update $23,550 <br /> C-6 Diurnal Pattern Development $3,681 <br /> C.7 Model Calibration $34,057 <br /> C-8 Progress Meeting#2 $3,184 <br /> C-9 Model Calibration Technical Memorandum $6,909 <br /> D Risk-Based Assessment for Linear Assets and Key Lift Stations $51,656 <br /> D.1 Develop Desktop Risk Based Assessment $8,055 <br /> D.2 Evaluate Risk Scores $9,668 <br /> D.3 Provide Recommendations for Future Data Collection for Risk <br /> Assessment $5,070 <br /> D.4 Develop Wastewater Renewal Projects $17,325 <br /> D.5 Progress Meeting#3 $4,148 <br /> D.6 Risk-Based Condition Assessment Technical Memorandum $7,391 <br /> E Wastewater System Analysis $58,432 <br /> E.1 Perform Existing Wastewater System Analysis $26,673 _ <br /> E.2 Perform Future Wastewater System Analysis $28,575 <br /> E.3 Progress Meeting#4 $3,184 <br /> F River Rd and Davis Ln Relief Lift Station Analysis $26,888 <br /> F.1 Data Collection and Review $7,109 <br /> F.2 Perform Hydraulic Analysis of LS 14 Contributing Areas $9,686 <br /> F.3 Progress Meeting#5 $3,184 <br /> F.4 Relief Lift Station Technical Memorandum $6,909 <br /> G Wastewater Treatment Plant Siting Evaluation $26,960 <br /> G.1 Conceptual WWTP Sizing __$1,914 <br /> G.2 Desktop Siting Study I $4,309 <br />
The URL can be used to link to this page
Your browser does not support the video tag.