Laserfiche WebLink
EXHIBIT 1 <br /> SCOPE OF SERVICES <br /> BARNES DRIVE WASTEWATER IMPROVEMENTS <br /> PROJECT UNDERSTANDING <br /> The project consists of the installation of approximately 600 linear feet of 6-inch diameter gravity <br /> wastewater line along Barnes Drive in front of the EI Milagro facility. The new wastewater line <br /> will redirect wastewater flow from EI Milagro to a nearby wastewater line to the southwest to <br /> make additional capacity available in the wastewater line on the northeast, currently serving the <br /> facility. <br /> The below Scope of Services includes the tasks to develop the Construction Plans and <br /> Technical Specifications for the improvements and assist the City with Bid and Construction <br /> Phase Services. <br /> SCOPE OF SERVICES <br /> A. Phase A— Preliminary Phase (30%) <br /> 1. Project Management and QA/QC: This task includes routine communication with the City; <br /> managing subconsultants, manpower, budgets, and schedules; invoicing; implementing <br /> and monitoring of QA/QC efforts; and other activities associated with managing the <br /> project. <br /> 2. Meetings—all meetings are assumed to be held virtually. <br /> a. Kick-off Meeting: K Friese+Associates(KFA)will prepare for and attend one kick- <br /> off meeting with the City to kick off the project. <br /> b. Status Meetings: One status meeting is assumed to discuss the pipeline route <br /> options. <br /> c. 30% Comments Review Meeting: Meet with the City to review the 30% Design <br /> Submittal and receive the City's comments. <br /> 3. Data Collection/Review <br /> a. KFA will obtain and review reports, studies, as-builts, and other data related to the <br /> project. This will include the City's current utility GIS layers. <br /> b. Identify Utility Providers: KFA will review the as-builts and survey data and <br /> coordinate with the City to determine utility service providers in the vicinity of the <br /> project and to request the plans and/or schematics of their utility lines within the <br /> project area. <br /> c. KFA will conduct one site visit to field verify collected data and identify <br /> discrepancies. <br /> 4. Field Investigations <br /> a. Design Survey- Plummer will conduct a design survey to include topography and <br /> surface features within the survey limits, trees 9-inches and larger, and visible <br /> utility information. Plummer will provide two on-site horizontal and vertical control <br /> points. Survey limits to consist of the Barnes Drive southeast right-of-way <br /> boundary to 50-feet outside the northwest right-of-way boundary, including 75-feet <br /> beyond the initiation and termination manholes. <br /> K F R I E S E <br /> + ASSOCIATES <br /> PUBLIC PROJECT ENOINEEERIIJG <br />