Laserfiche WebLink
EXHIBIT 1 <br /> SCOPE OF SERVICES <br /> BARNES DRIVE WASTEWATER IMPROVEMENTS <br /> b. Subsurface Utility Locates: It has been assumed that the City will provide <br /> subsurface utility locates through the City's on-call contract. KFA will coordinate <br /> with the City to identify the locations. <br /> c. Geotechnical Investigation: No Geotechnical Investigation will be performed for <br /> this project <br /> 5. Pipeline Alignment Evaluation: Using the collected information, up to two pipeline <br /> alignments will be evaluated considering system integration, existing utility interference, <br /> traffic control, and cost. <br /> 6. Project Permitting/Design Requirements: KFA will determine project permitting and <br /> design requirements for local, state, and federal entities. Based on a preliminary review it <br /> is anticipated that only City approvals will be required. <br /> 7. Identify Utility Providers and Conflicts: Develop a Utility Conflicts Analysis Table based <br /> on the 30% design. <br /> 8. Develop Construction Cost Estimates: A Class C (± 25%) opinion of probable cost for the <br /> preferred route will be developed. <br /> 9. Deliverables: <br /> a. Draft Preliminary Engineering Design Memorandum: A Design Memorandum will <br /> be prepared summarizing the investigation and recommendations. At a minimum <br /> the Design Memorandum will include: <br /> i. 30% Plan & Profile Sheets of the preferred alignment for the wastewater <br /> line using the survey and gathered information and showing existing and <br /> proposed appurtenances, and proposed workspace. Sheets shall be 11" <br /> x 17" at a scale of 1" = 40'. <br /> ii. Class C (± 25%) opinion of probable cost for the preferred route <br /> iii. Permitting requirements and associated timeframes <br /> iv. Updated Design and Construction Schedule <br /> V. KFA will provide one(1) electronic copy in pdf format of the Draft Design <br /> Memorandum to the City. <br /> vi. GIS Submittal Checklist <br /> vii. CIP Plan Review Checklist <br /> b. Final Preliminary Engineering Design Memorandum: Following the review <br /> meeting with the City, KFA will address City comments and submit a Final <br /> Preliminary Engineering Design Memorandum in pdf Format and electronic copy <br /> of the 30% Design Plans in DWG format. <br /> B. Phase B— Design Phase (60°/x/90%/100%) <br /> 1. Project Management and QA/QC: This task includes routine communication with the City; <br /> managing subconsultants, manpower, budgets, and schedules; invoicing; implementing <br /> and monitoring of QA/QC efforts; and other activities associated with managing the <br /> project. <br /> 2. Meetings—all meetings are assumed to be held virtually. <br /> K F R I E S E <br /> + ASSOCIATES <br /> 2 <br /> ruBuc c wecT.„uNEEaitae <br />