My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-177R/approving a professional services agreement with K Friese and Associates for design services relating to the Barnes Drive Wastewater
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-177R/approving a professional services agreement with K Friese and Associates for design services relating to the Barnes Drive Wastewater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 10:59:33 AM
Creation date
10/25/2022 3:16:32 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2022-177R
Date
8/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT 1 <br /> SCOPE OF SERVICES <br /> BARNES DRIVE WASTEWATER IMPROVEMENTS <br /> a. Comments Review Meetings: Two project meetings with the City have been <br /> budgeted for the Barnes Drive Design Phase to review the City's comments on the <br /> 60% and 90% submittals. <br /> b. Project Meetings: Three project meetings have been budgeted for the Design <br /> Phase to be scheduled when needed. <br /> 3. Construction Plans: KFA shall prepare construction plans suitable for public bidding to <br /> include notes, plan and profile sheets, details, environmental protection, traffic control, <br /> construction phasing, and work and storage locations. For the purposes of this proposal <br /> the plan set is assumed to be 11" x 17" paper, plan and profile sheets are assumed to be <br /> at 1" = 40' horizontal and 1" = 10' vertical scale. The construction plans will be in <br /> accordance with City of San Marcos CADD Standards and will contain the following: <br /> c. Cover Sheet/index <br /> d. Project Layout <br /> e. General Notes (Estimated Number of Sheets: 2) <br /> f. Quantities: Quantities will be indicated by sheet <br /> g. Erosion Control <br /> i. SWPPP (TxDOT Template) (Estimated Number of Sheets: 2) <br /> ii. EPIC (TxDOT Template) <br /> iii. E&S Plan <br /> h. Traffic Control Narrative and typical details (Estimated Number of Sheets: 6) <br /> i. Wastewater Line Plan and Profile Sheets (Estimated Number of Sheets: 2) <br /> j. Bypass Pumping Plan and Profile Sheet (Estimated Number of Sheets:1) <br /> k. Waterline Relocation Sheet (Estimated Number of Sheets:1) <br /> I. Details (Estimated Number of Sheets: 2) <br /> 4. Deliverables: <br /> m. 60%: One pdf electronic copy. The 60% submittal will contain the following: <br /> i. Construction Plans—full set not including quantity sheets <br /> ii. Technical Specifications <br /> 1. Table of Contents <br /> iii. Engineer's Opinion of Probable Construction Cost: A Class B estimate (± <br /> 10%)will be provided. <br /> iv. Construction Project Schedule: KFA will develop a Construction Schedule <br /> for the project consisting of design, bid and construction phases. The <br /> schedule will be updated during design. <br /> v. CIP Plan Review Checklist <br /> vi. GIS Submittal Checklist <br /> n. 90%: One pdf electronic copy. The 90% submittal will contain the following: <br /> EMEW <br /> NEW K F R I E S E <br /> + ASSOCIATES <br /> 3 L FULILI ^AOJECT ENGINEERING <br />
The URL can be used to link to this page
Your browser does not support the video tag.