My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-177R/approving a professional services agreement with K Friese and Associates for design services relating to the Barnes Drive Wastewater
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-177R/approving a professional services agreement with K Friese and Associates for design services relating to the Barnes Drive Wastewater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 10:59:33 AM
Creation date
10/25/2022 3:16:32 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2022-177R
Date
8/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT 1 <br /> SCOPE OF SERVICES <br /> BARNES DRIVE WASTEWATER IMPROVEMENTS <br /> grid conversion scale factor for GIS will also be provided. The GIS Submittal Checklist will <br /> be provided. <br /> ASSUMPTIONS AND SUPPLEMENTAL SERVICES <br /> 1. Survey of downstream appurtenances: The City has identified three manholes and two <br /> cleanouts downstream of the project area that may require an elevation survey. This work <br /> will be separately authorized under the Supplemental Services budget. <br /> 2. Easements: Budget has been included in Supplemental Services for one Temporary <br /> Workspace/Proposed Easement Sketch and one Permanent Easement Sketch with Field <br /> Notes. <br /> 1 Subsurface Utility Locates: It has been assumed that the City will provide subsurface utility <br /> locates through the City's on-call contract. <br /> 4. Right-of-Entry: The City will acquire right-of-entry from EI Milagro for survey and design <br /> activities. <br /> 5. Stormwater Permitting: Since the project will disturb less than one acre, coverage under the <br /> TCEQ Construction General Permit is not required. <br /> 6. Antiquities Permit: It has been assumed that the Texas Historical Commission will not <br /> require an investigation or monitoring during construction for antiquities and that no <br /> investigations will be required prior to construction. It is also assumed that a Texas Historical <br /> Commission letter will not be required as the site is not near any known historical sites, will <br /> disturb less than 5,000 cubic yards, and the project area is less than five-acres. <br /> 7. The City will perform bid advertising and printing/distribution of bid document. <br /> 8. The City will provide required construction administration and inspection services outside of <br /> the services listed in this Scope of Work. <br /> 9. The City will provide materials testing and sampling during construction. <br /> K F R I E S E <br /> + ASSOCIATES <br /> 6 PU OJECT.ENI If I ECr ItG <br />
The URL can be used to link to this page
Your browser does not support the video tag.