Laserfiche WebLink
Mr. Drew Wells <br /> August 15, 2022 <br /> Page 11 <br /> enactment or revision codes, laws, or regulations after the preparation <br /> of such documents. <br /> • Preparation of phased bid package(s) with reduced scope of items <br /> defined herein, including construction drawings and specifications not <br /> included as part of phase 1 development. <br /> • Any design work that will require work in the ROW or impact traffic <br /> entering and exiting the public and private ROW not accounted for in <br /> basic scope of services. <br /> • Traffic Impact Analysis. <br /> • Independent cost estimating by a third party. <br /> • Energy/Utility modeling of buildings. <br /> • Preparation of re-bid documents due to unsuccessful bid and value <br /> engineering beyond City and consultant control. <br /> • Temporary Traffic Control Plans conforming to Texas MUTCD. <br /> • Reviewing and evaluating alternate designs proposed by contractor <br /> during construction. <br /> • Construction Staking. <br /> • Construction quality control and materials testing. <br /> • As built/Improvements surveys after construction. <br /> • Storm Water Pollution Prevention Plan (SWPPP), to be provided by <br /> contractor. <br /> • Services required after final acceptance of constructed work. <br /> • Preparation of presentation materials for marketing or purposes other <br /> than in-progress approvals. <br /> • Provide consultation, drawings, reports and other work products <br /> related to permits, approvals and ordinances not described in scope of <br /> services. <br /> • Providing professional services for the field selection of plant <br /> materials. <br /> • Shade Structure Design (other than pre-engineered structures). <br /> • Bridge Design (other than pre-engineered structures). <br /> • Voice/Data System, Fiber Optic Network, Access Control/Security <br /> System and Audio System design. (Provisions — jboxes and extra <br /> conduit provided into building structures only). <br /> • Natural Gas design. <br /> • LEEDs/Green Building/LID/SITES compliant design. <br /> • Engineering Commissioning, required on buildings with more than 40 <br /> tons A/C. <br />