Mr. Drew Wells <br /> August 15, 2022 <br /> Page 10 <br /> • Landscape and irrigation improvements in common areas, parking lots, <br /> main entry. <br /> Final design will be based on master plan dated July 28, 2021. <br /> On-site water and wastewater services will be used to serve the cemetery plots, <br /> however adjustments and relocation may be required. Water and wastewater <br /> design outside of the park boundary will require additional scope and fee. <br /> A Floodplain Study is not being provided as part of this scope of services; if <br /> future design impacts warrant that a floodplain study be provided the consultant <br /> will enter into discussions with the City for a Floodplain Study to be provided as <br /> an additional service. <br /> The floodplain note will be based on the current flood insurance rate maps <br /> prepared by F.E.M.A. or City approved drainage study only. <br /> The fee does not include preparation of a floodplain study or research to <br /> determine if one is necessary or has been performed, or detailed drainage studies <br /> to analyze conveyance of off-site runoff involving HEC-1, HEC-2 or other similar <br /> hydrologic or hydraulic analyses including survey cross sections, field notes and <br /> easements. The fee does not include CLOMR or LOMR preparation or <br /> communication with F.E.M.A. <br /> Our understanding is that the project does not have any Planned Development <br /> District(PDD)restrictions for cemeteries. <br /> The following services are excluded unless specifically included in the proposal: <br /> • Public stakeholder meetings and/or other presentations/facilitation <br /> beyond those described in scope of services. <br /> • Increase in construction documentation, regulatory entitlement, <br /> bidding assistance and construction phase services resulting from <br /> increase in development budget of more than 10% beyond design <br /> development phase. <br /> • Revisions to drawings previously approved by the City and regulatory <br /> entities due to changes in: Project scope, budget, schedule, unforeseen <br /> subsurface construction conditions or when such revisions are <br /> inconsistent with written approvals or instructions previously given; <br />