Mr. Drew Wells <br /> August 15, 2022 <br /> Page 4 <br /> of San Marcos Cemetery Expansion Improvements Master Plan dated July <br /> 28, 2021 (Attachment A) and further described in Item "II — Client <br /> Responsibilities and Project Assumptions". Site layout plans with <br /> dimensional control information necessary to construct site improvements, <br /> including general roadway layout, site grading and drainage, general <br /> pedestrian walkways and gravesite location improvements will be <br /> provided. <br /> The consultant will design grading plans with vertical information <br /> necessary for construction. Site drainage and storm sewer plans with <br /> information necessary for construction will be provided with site details <br /> indicating specific information and data necessary for construction site <br /> improvements. Irrigation plans and details necessary for construction of <br /> the mainline and quick couplers will be provided as well. It is assumed <br /> that the water source for the irrigation will be from a metered potable <br /> water line. <br /> On March 5, 2003, the National Pollution Discharge Elimination System <br /> (NPDES) permitting authority was transferred over to the Texas <br /> Commission on Environmental Quality (TCEQ). TCEQ's general permit <br /> (TPDES construction General Permit TXR 150000) combines large <br /> construction activity (5 or more acres) and small construction activity(1 to <br /> less than 5 —acres) requirements for all projects in the state of Texas. The <br /> construction activity for the park is anticipated to be under five acres; <br /> therefore,this project falls under small construction activity requirements. <br /> 1. We will prepare an erosion control layout plan for the project, <br /> identifying locations of proposed erosion control measures and furnish <br /> to the City of San Marcos. The contractor must display the plan at the <br /> job site as part of his Storm Water Pollution Prevention Plan and <br /> update the plan accordingly to the requirements listed in the SWP3. <br /> The contractor must follow the plan and the local MS4 operator must <br /> be notified 48 hours prior to the start of the construction. <br /> The consultant will prepare drainage plans for submittal for a <br /> Comprehensive Site Preparation Application to the City, if applicable. <br /> The consultant will prepare an erosion control sheet for inclusion into the <br /> plan set. <br />