Laserfiche WebLink
Mr. Drew Wells <br /> August 15, 2022 <br /> Page 5 <br /> We will prepare a water service plan to the cemetery improvements based <br /> on the City of San Marcos design criteria. The water service plan will <br /> include the proposed water line from the existing nearby water. <br /> The consultant will provide: <br /> Utility Coordination <br /> • Map existing utilities in the project area from surface features and 811 <br /> markings. <br /> • Provide utility company external coordination. <br /> • Identify potential utility conflicts. <br /> • Recommend utility potholing(if necessary). <br /> • Resolve potential utility conflicts through design modifications and/or <br /> recommended utility adjustments. <br /> • Coordinate with San Marcos Electric Utility (SMEU) on the removal of <br /> the existing OH electric facilities within the project site. <br /> Demolition/Removal Plan <br /> • Prepare plan showing all site features to be removed by the contractor. <br /> Drainage Report <br /> • Conduct pre/post development drainage analysis. <br /> • Prepare site stormwater layouts. <br /> •Prepare site drainage report. <br /> COSM LDC Chapter 6 - Environmental Regulations <br /> • Prepare Calculation of Impervious Cover(anticipated less than 25%) <br /> •Prepare temporary erosion and sediment controls. <br /> • Prepare stormwater quality and stream treatment. <br /> Project Site Plan <br /> •Proposed erosion and sedimentation controls (SW3P). <br /> • Proposed stormwater quality treatment. <br /> • Proposed 2" irrigation water system and hose bibs. <br /> • Proposed site grading, contours, and spot elevations for all <br /> improvements. <br /> • Proposed surface drainage improvements consisting of swales (no plan <br /> and profiles) <br /> • Proposed asphalt cemetery roads with concrete aprons (no plan and <br /> profiles). <br />