Laserfiche WebLink
Exhibit 1 <br /> CITY OF SAN MARCOS HIGHWAY 80 UTILITY PROJECT <br /> SCOPE OF SERVICES-AMENDMENT NO. 2 <br /> PROJECT UNDERSTANDING <br /> Freese and Nichols, Inc. (FNI)will provide engineering design, bid and construction phase services for <br /> the City of San Marcos (City) related to the HWY 80 Utility Project. Amendment No. 2 includes <br /> additional services and revisions to Amendment No. 1. <br /> Add the following facilities to The Scope of Work: <br /> 1. Approximately 15,700 linear feet of new 12-inch HDPE reclaimed water main from the City's <br /> wastewater treatment plant to the Highway 80 Lift Station. <br /> General Assumptions: <br /> No changes. <br /> ARTICLE I <br /> BASIC SERVICES: FNI shall render the following professional services in relation to the addition of the <br /> reclaimed water main: <br /> 1. PROJECT MANAGEMENT: <br /> No changes. <br /> 2. DESIGN PHASE: FNI shall provide the additional professional services in this phase as follows: <br /> Prepare phase effort relating to the reclaimed water main in accordance with Attachment A— <br /> Engineering Scope of Services Checklist Plans. Project plans will be in accordance with Attachment B <br /> —Engineering/CIP Plan Review Checklist. <br /> 3. 30% DESIGN PHASE: <br /> No changes. <br /> 4. 60% DESIGN PHASE: <br /> No changes. <br /> 5. 90% DESIGN PHASE: <br /> No changes. <br /> 6. 100% DESIGN PHASE: <br /> No changes. <br /> 7. BID PHASE: <br /> No changes. <br /> 8. CONSTRUCTION PHASE GENERAL REPRESENTATION: <br /> No changes. <br /> 9. RECORD DRAWING PHASE: <br /> Page 1 of 3 <br />