My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-048/approving a Change in Service to the Highway 80 Utility Project agreement with Freese and Nichols, Inc. related to design of 15,700 additional linear feet of reclaimed water main from city’s wastewater treatment
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-048/approving a Change in Service to the Highway 80 Utility Project agreement with Freese and Nichols, Inc. related to design of 15,700 additional linear feet of reclaimed water main from city’s wastewater treatment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 1:32:26 PM
Creation date
4/12/2023 4:13:10 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2023-48
Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit 1 <br /> CITY OF SAN MARCOS HIGHWAY 80 UTILITY PROJECT <br /> SCOPE OF SERVICES-AMENDMENT NO. 2 <br /> PROJECT UNDERSTANDING <br /> Freese and Nichols, Inc. (FNI)will provide engineering design, bid and construction phase services for <br /> the City of San Marcos (City) related to the HWY 80 Utility Project. Amendment No. 2 includes <br /> additional services and revisions to Amendment No. 1. <br /> Add the following facilities to The Scope of Work: <br /> 1. Approximately 15,700 linear feet of new 12-inch HDPE reclaimed water main from the City's <br /> wastewater treatment plant to the Highway 80 Lift Station. <br /> General Assumptions: <br /> No changes. <br /> ARTICLE I <br /> BASIC SERVICES: FNI shall render the following professional services in relation to the addition of the <br /> reclaimed water main: <br /> 1. PROJECT MANAGEMENT: <br /> No changes. <br /> 2. DESIGN PHASE: FNI shall provide the additional professional services in this phase as follows: <br /> Prepare phase effort relating to the reclaimed water main in accordance with Attachment A— <br /> Engineering Scope of Services Checklist Plans. Project plans will be in accordance with Attachment B <br /> —Engineering/CIP Plan Review Checklist. <br /> 3. 30% DESIGN PHASE: <br /> No changes. <br /> 4. 60% DESIGN PHASE: <br /> No changes. <br /> 5. 90% DESIGN PHASE: <br /> No changes. <br /> 6. 100% DESIGN PHASE: <br /> No changes. <br /> 7. BID PHASE: <br /> No changes. <br /> 8. CONSTRUCTION PHASE GENERAL REPRESENTATION: <br /> No changes. <br /> 9. RECORD DRAWING PHASE: <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.