ARTICLE V <br />CONCEPT PLAN AND FACILITIES <br />Section 5.01 Concept Plan and Permitted Uses. All development within the Property shall comply with (i) <br />the Concept Plan attached hereto as Exhibit B, (ii) Table 1 in Section 4.02 of this Agreement and Tables 2 and 3 <br />in Section 8.01 of this Agreement, (iii) the City Codes (as modified by Exhibit C, Development Waivers, in <br />accordance with Section 2.02 of this agreement, and otherwise by this Agreement), (iv) the Roadway Design <br />Standards and Typical Cross Sections described in Exhibits E and E-1, and (v) the terms and conditions of this <br />Agreement. <br />Section 5.02 Future ISD Facilities. The areas generally depicted on the Concept Plan as `Schools' shall be <br />dedicated to either the Lockhart ISD ("LISD") or the San Marcos ISD ("SMISD" (LISD and SMISD are <br />collectively referred to herein as "ISD") for use as either an elementary or middle school. Such dedication to <br />occur at a time that shall be mutually agreed upon between the Owner and the ISD, but no sooner than a period <br />of three (3) years after the time the Subdivision Concept Plat for that parcel is approved, and no later than five <br />(5) years after the date the Preliminary Subdivision Plat for that parcel is approved. If the ISD district fails to <br />accept the property within the foregoing timeframes, then the property may be developed in a manner <br />compatible with adjacent uses, as shown in Exhibit B. <br />Section 5.03 ESD/Future COSM Public Safety Facility. The Primary Owner shall reserve two (2) sites <br />located adjacent to a major thoroughfare, in the project within'/4 quarter road miles (measured along public roads) <br />from the locations specified on Exhibit B-2, for the purpose of future locations for fire and EMS facilities ("Public <br />Safety Facility Sites"). Each Public Safety Facility Site shall be a minimum of three (3) acres. In the event that <br />Primary Owner desires to move the Public Safety Facility Site beyond '/4 road miles from the location(s) shown <br />on Exhibit B, this may be done administratively, if the City agrees to the new location; provided, however, if the <br />Primary Owner and the City are unable to reach an agreement regarding the relocation of the Public Safety Facility <br />Site, this will be resolved through the Major Amendment Process outlined in Section 16.01 of this Agreement. <br />The fire and EMS facilities (the "Public Safety Facilities") to be constructed on the Public Safety Facility Sites <br />will be constructed in accordance with the following schedules: <br />(i) Within six (6) months after Cotton Center has reached two thousand (2,000) Residential Utility <br />Connections, either (1) the ESD serving Cotton Center or (2) the ESD serving Cotton Center in <br />conjunction with the Primary Owner; or (3) Primary Owner, shall commence construction of a <br />Public Safety Facility on the Public Safety Facility Sites located within proposed Sub -District 1 as <br />shown on Exhibit B-1, and shall complete construction of such Public Safety Facility within one <br />(1) year following commencement of construction; and <br />(ii) Within six (6) months after Cotton Center has reached four thousand (4,000) Residential Utility <br />Connections, either (1) the ESD serving Cotton Center or (2) the ESD serving Cotton Center in <br />conjunction with the Primary Owner, or (3) Primary Owner shall commence construction of the <br />second Public Safety Facility on the Public Safety Facility Site located within proposed Sub - <br />District 4 as shown on Exhibit B-1, and shall complete construction of such Public Safety Facility <br />within one (1) year following commencement of construction. <br />(iii) The City shall have the ability to withhold any Preliminary Subdivision Plat or Final Plat if the <br />construction of the Public Safety Facility has not commenced within six (6) months or has not <br />been completed within one (1) year following commencement. <br />