My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-021R Approving a first amendment and reinstated agreement with Franklin Mountain San Marcos
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-021R Approving a first amendment and reinstated agreement with Franklin Mountain San Marcos
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:34:34 AM
Creation date
5/4/2023 2:52:45 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CODE REFERENCE <br />CODE STANDARD <br />PROPOSED <br />MODIFICATION <br />(o) Construction of Streets. All streets shall be <br />Modify requirement and <br />constructed in accordance with paving widths and <br />replace it with the <br />specifications as set forth in the TCSS of the City <br />following language <br />of San Marcos at the time at which the preliminary <br />"Construction of Streets. <br />plat application is officially submitted and deemed <br />All streets shall be <br />a complete application. <br />constructed in accordance <br />Article 4, Division 1, <br />with paving widths and <br />Section 7.4.1.4 (o) — <br />specifications as set forth <br />Specific Street Standards <br />in Exhibits "E" "E-1 " <br />and "E-2 " attached <br />hereto at the time a <br />preliminary plat <br />application is officially <br />submitted and deemed <br />complete. " <br />(b) Design Storm Event. All drainage facilities <br />Modify requirement and <br />(including street curbs, gutters, inlets and storm <br />replace it with the <br />wastewaters) shall be designed to intercept and <br />following language <br />transport runoff from a 25 -year frequency storm. <br />"Design Storm Event. All <br />The drainage system shall be designed to convey <br />drainage facilities <br />those flows greater than a 25 -year frequency, up to <br />(including street curbs, <br />and including a 100 -year frequency storm within <br />gutters, inlets and <br />defined rights-of-way or drainage easements. Peak <br />stormwaters) shall be <br />flows shall not be increased at any location for the <br />designed to intercept and <br />2-, 5-, 10-, 25-, 50- or 100 -year storm frequency <br />transportrunofffrom a <br />which causes increased inundation of any building <br />25 year frequency storm. <br />Article 5, Division 1, <br />or roadway surface. <br />The drainage system shall <br />Section 7.5.1.1 (b) —Storm <br />be designed to convey <br />Water Collection and <br />those flows greater than a <br />Drainage Conveyance. <br />25 year frequency, up to <br />and including a 100 year <br />frequency storm within <br />defined rights-of-way or <br />drainage easements. <br />Peak flows shall not be <br />increased at any location <br />for the 2, 10, 25, or 100 <br />year -storm frequency <br />which causes increased <br />inundation of any building <br />or roadwa surface." <br />
The URL can be used to link to this page
Your browser does not support the video tag.